East Wiltshire has 2.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 800 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 39,813 homes.

Ranks 327 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Mount Pleasant Farm - Solar FarmBelltown Power Limited Solar 35 MW13,000 homes Waiting 14 months for a planning decisionWho can move it: Swindon Council · planning ref S/25/0666
Building ONEScience Museum Group Solar 1.2 MW400 homes Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref S/19/0229

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
East Wiltshire 2.3 MW63 MWnot visible
Salisbury 52 MW24 MWnot visible
South West Wiltshire 74 MW71 MWnot visible
Melksham and Devizes 51 MW133 MWnot visible
Chippenham 103 MW101 MWnot visible
North West Hampshire 4.7 MW61 MWnot visible

Chippenham next door has 103 MW waiting, more than East Wiltshire's 2.3 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.