Dunfermline and Dollar

MP: Graeme Downie (Labour) Scotland Data to July 2026

Dunfermline and Dollar has 36 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 13,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.9m across the constituency's 42,688 homes.

Ranks 164 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Kincardine Grid Services Complex - Energy Storage FacilityAmp Energy Battery 400 MW Approved 5 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref ECU00003326
Kincardine Battery StorageGresham House Devco Pipeline Limited Battery 342 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref ECU00004987
Nettly Burn Renewable Energy ParkGrupotec Solar UK 4 Ltd Solar 80 MW29,000 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref ECU00006007
Craigluscar, Craigluscar Road - Solar Array & Battery StorageLocogen Consulting Limited Solar 40 MW15,000 homes Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 24/02548/FULL
Dunfermline North - Solar Photovoltaic Array/Battery storageDunfermline Solar Limited (AMPYR Solar Europe) Solar 30 MW11,000 homes Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 22/01225/FULL
Dunfermline North - Solar Photovoltaic Array/Battery storageDunfermline Solar Limited (AMPYR Solar Europe) Battery 20 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 22/01225/FULL
Nettly Burn Renewable Energy ParkGrupotec Solar UK 4 Ltd Battery 15 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref ECU00006007
Craigluscar, Craigluscar Road - Solar Array & Battery StorageLocogen Consulting Limited Battery 9.9 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 24/02548/FULL
Babcock Marine Bldg, Wood Road - Solar Photovoltaic ArrayBabcock Marine Solar 5.6 MW2,000 homes Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 23/02089/FULL

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Dunfermline and Dollar 36 MW5.1 MWnot visible
Stirling and Strathallan 52 MW193 MWnot visible
Cowdenbeath and Kirkcaldy 70 MW39 MWnot visible
Alloa and Grangemouth 1.7 MW66 MWnot visible
Glenrothes and Mid Fife 121 MW48 MWnot visible
Perth and Kinross-shire 43 MW44 MWnot visible

Glenrothes and Mid Fife next door has 121 MW waiting, more than Dunfermline and Dollar's 36 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 3 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call