CONSTITUENCY BRIEFING · ENERGYMAP.APP
Colne Valley
Colne Valley has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 40,854 homes.
Ranks 461 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Colne Valley | 0.7 MW | 0 MW | not visible |
| High Peak | 0.3 MW | 0 MW | not visible |
| Penistone and Stocksbridge | 0 MW | 26 MW | not visible |
| Ossett and Denby Dale | 52 MW | 0 MW | not visible |
| Huddersfield | 5.1 MW | 0 MW | not visible |
| Oldham East and Saddleworth | 0.5 MW | 0 MW | not visible |
Ossett and Denby Dale next door has 52 MW waiting, more than Colne Valley's 0.7 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.