CONSTITUENCY BRIEFING · ENERGYMAP.APP

Cheltenham

MP: Max Wilkinson (Liberal Democrat) England Data to July 2026

Cheltenham has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.1m across the constituency's 44,876 homes.

Ranks 491 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Cheltenham General Hospital - Battery Energy Storage SystemGloucestershire Hospitals NHS Foundation Trust Battery 2.2 MW Approved 5 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 21/01884/FUL

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Cheltenham 0.5 MW0 MWnot visible
North Cotswolds 55 MW14 MWnot visible
Tewkesbury 66 MW41 MWnot visible

Tewkesbury next door has 66 MW waiting, more than Cheltenham's 0.5 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.