Basingstoke has 2.1 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 800 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 45,583 homes.

Ranks 338 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Hook Lane, MalshangerNextpower SPV 18 Limited Solar 30 MW11,000 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 23/03012/FUL

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Basingstoke 2.1 MW0 MWnot visible
Winchester 19 MW58 MWnot visible
East Hampshire 78 MW56 MWnot visible
North West Hampshire 4.7 MW61 MWnot visible
North East Hampshire 168 MW11 MWnot visible

North East Hampshire next door has 168 MW waiting, more than Basingstoke's 2.1 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.