CONSTITUENCY BRIEFING · ENERGYMAP.APP
Aldridge-Brownhills
Aldridge-Brownhills has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,205 homes.
Ranks 484 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Chapel Lane - Battery Energy Storage SystemAnesco Limited | Battery | 49 MW | Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 23/1286 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Aldridge-Brownhills | 0.5 MW | 0 MW | not visible |
| Tamworth | 113 MW | 2 MW | not visible |
| West Bromwich | 3.4 MW | 1 MW | not visible |
| Birmingham Perry Barr | 2.4 MW | 0 MW | not visible |
| Sutton Coldfield | 0 MW | 0 MW | not visible |
| Walsall and Bloxwich | 1.6 MW | 0 MW | not visible |
Tamworth next door has 113 MW waiting, more than Aldridge-Brownhills's 0.5 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call