CONSTITUENCY BRIEFING · ENERGYMAP.APP
Birmingham Perry Barr
Birmingham Perry Barr has 2.4 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 900 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,446 homes.
Ranks 322 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Birmingham Perry Barr | 2.4 MW | 0 MW | not visible |
| Birmingham Ladywood | 1.9 MW | 0 MW | not visible |
| Smethwick | 0.3 MW | 0 MW | not visible |
| West Bromwich | 3.4 MW | 1 MW | not visible |
| Birmingham Erdington | 2.6 MW | 0 MW | not visible |
| Sutton Coldfield | 0 MW | 0 MW | not visible |
West Bromwich next door has 3.4 MW waiting, more than Birmingham Perry Barr's 2.4 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.