CONSTITUENCY BRIEFING · ENERGYMAP.APP

Tipton and Wednesbury

MP: Antonia Bance (Labour) England Data to July 2026

Tipton and Wednesbury has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.1m across the constituency's 44,233 homes.

Ranks 447 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Midland Quarry Products, Smith Road - Battery StorageGresham House Devco Pipeline Limited Battery 10 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref DC/24/69271
WednesburyKew Technologies (formerly JCB Broadcrown) EfW Incineration 2 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref DC/14/57758
Moorcroft Drive, Moorcroft Park - Solar PanelsNoble Green Energy Solar 1.3 MW500 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PD/25/03053

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Tipton and Wednesbury 0.8 MW0 MWnot visible
West Bromwich 3.4 MW1 MWnot visible
Dudley 0.2 MW0 MWnot visible
Wolverhampton South East 2.8 MW0 MWnot visible
Walsall and Bloxwich 1.6 MW0 MWnot visible

West Bromwich next door has 3.4 MW waiting, more than Tipton and Wednesbury's 0.8 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.