CONSTITUENCY BRIEFING · ENERGYMAP.APP

Sunderland Central

MP: Lewis Atkinson (Labour) England Data to July 2026

Sunderland Central has 1.1 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 400 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,494 homes.

Ranks 404 of 650 for clean power approved and not built.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Sunderland Central 1.1 MW0 MWnot visible
Easington 102 MW33 MWnot visible
Houghton and Sunderland South 2.4 MW11 MWnot visible
Washington and Gateshead South 26 MW16 MWnot visible
South Shields 0.7 MW0 MWnot visible

Easington next door has 102 MW waiting, more than Sunderland Central's 1.1 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.