Stone, Great Wyrley and Penkridge has 125 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 45,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.5m across the constituency's 38,510 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Preston Hill Farm, Penkridge - Solar FarmPreston Hill Farm Preston Vale Penkridge | Solar Photovoltaics | 18,000 homes | 49.9 MW | 2024-02 | 2.5 yrs |
| Hanyards Lane, Tixall - Solar Energy ParkNorth Of Hanyards Lane Tixall | Solar Photovoltaics | 18,000 homes | 49.5 MW | 2024-06 | 2.1 yrs |
| Four Ashes, Deepmore Lane - Solar FarmS/O Four Ashes, Deepmore Lane, Coven, Wolverhampton | Solar Photovoltaics | 8,200 homes | 22.5 MW | 2024-07 | 2.0 yrs |
| Acton Trussell - Solar SystemGranite One Hundred Acton Gate Acton Trussell | Solar Photovoltaics | 300 homes | 0.9 MW | 2022-07 | 4.1 yrs |
| Alpha Manufacturing, Pasturefields - Solar PV SystemAlpha Manufacturing, Pasturefields Industrial Estate, Pasturefields Lane, Pasturefields, Stafford | Solar Photovoltaics | 300 homes | 0.7 MW | 2022-07 | 4.1 yrs |
| Church Lane, Hixon - Solar PV PanelsBri Stor Systems Limited, Hixon Industrial Estate, Church Lane, Hixon | Solar Photovoltaics | 300 homes | 0.7 MW | 2022-01 | 4.6 yrs |
| Pillaton Foods, Cannock Road - Solar PanelsPillaton Foods Ltd The Poultry Farm Cannock Road Penkridge | Solar Photovoltaics | 300 homes | 0.7 MW | 2024-04 | 2.3 yrs |
Plus 7 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Oaklands Farm, New Road - Battery Energy Storage | 70 MW | approved, not built 2024 | could supply ≈245,000 homes |
| Levedale Road, Levedale - Battery Energy Storage | 50 MW | approved, not built 2024 | could supply ≈175,000 homes |
| Upper Latherford Farm, Latherford Lane - Battery Energy Storage System | 50 MW | approved, not built 2024 | could supply ≈175,000 homes |
| Hobble Lane, Great Wyrley - Battery Energy Storage | 50 MW | approved, not built 2025 | could supply ≈175,000 homes |
| Chillington Estate, Chillington Park - Battery Storage | 40 MW | approved, not built 2025 | could supply ≈140,000 homes |
| Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage | 30 MW | approved, not built 2025 | could supply ≈105,000 homes |
| Yew Tree Farm, Drointon Lane | 30 MW | in planning | could supply ≈105,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Sir Gavin Williamson said about the grid in Parliament? Search Hansard →