Southport has 2.9 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,100 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,630 homes.
Ranks 301 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Huntapac Produce Limited, Blackgate Lane - Solar Photovoltaic SystemHuntapac Produce Limited | Solar | 1.3 MW500 homes | Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 2022/1227/FUL |
| Crossens Pumping Station - Solar ArrayEnvironment Agency | Solar | 1 MW400 homes | Approved 4 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 2021/0937/FUL |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Southport | 2.9 MW | 0 MW | not visible |
| Sefton Central | 11 MW | 0 MW | not visible |
| West Lancashire | 1.5 MW | 3.3 MW | not visible |
| South Ribble | 4.4 MW | 4.8 MW | not visible |
Sefton Central next door has 11 MW waiting, more than Southport's 2.9 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.