CONSTITUENCY BRIEFING · ENERGYMAP.APP
Southampton Itchen
Southampton Itchen has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.3m across the constituency's 46,715 homes. A 50 MW battery was refused planning here in 2025; while discharging it could have supplied about 175,000 homes.
Ranks 569 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Butts Field, Mill Lane - Battery StorageEcotricity Generation Limited | Battery | 99 MW | Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 23/02942/FULLS |
| Weston Lane - Battery Storage FacilityAnglo Renewables Limited | Battery | 50 MW | Refused by Southampton Council in 2025Who can move it: Southampton Council · planning ref 23/03055/FULLS |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Southampton Itchen | 0 MW | 0 MW | not visible |
| Hamble Valley | 6.5 MW | 18 MW | not visible |
| Eastleigh | 29 MW | 6.3 MW | not visible |
| Southampton Test | 1.9 MW | 0 MW | not visible |
| Romsey and Southampton North | 118 MW | 165 MW | not visible |
Romsey and Southampton North next door has 118 MW waiting, more than Southampton Itchen's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 3 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call