CONSTITUENCY BRIEFING · ENERGYMAP.APP

Penrith and Solway

MP: Markus Campbell-Savours (Labour) England Data to July 2026

Penrith and Solway has 4.7 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,700 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.0m across the constituency's 43,873 homes. There is also 50 MW of wind running here on the local network. If that gets switched off, no national record shows it.

Ranks 267 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
West Farm, Aspatria - Battery Storage FacilityNet Zero Seventeen Limited Battery 50 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref FUL/2024/0085
High Rigg Solar Farm - Solar PanelsNoventum Power Limited Solar 30 MW11,000 homes Refused by Westmorland and Furness Council in 2026Who can move it: Westmorland and Furness Council · planning ref 2025/1267/FPA
Ewanrigg Farmhouse, Ewanrigg - Solar FarmAnesco Limited Solar 13 MW4,700 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref FUL/2025/0080
Former Broughton Lodge ResubmissionPeel Energy Onshore wind 9 MW7,900 homes Nothing published says what is holding this up · planning ref 2/2009/0880
Roxane UK, Armathwaite - Solar Array & Battery StorageRoxane UK Limited Solar 5 MW1,800 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 2025/1585/FPA

Plus 2 smaller projects — see the full seat page.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Penrith and Solway 4.7 MW92 MWnot visible
Bishop Auckland 52 MW8 MWnot visible
Hexham 23 MW56 MWnot visible
Barrow and Furness 5.5 MW38 MWnot visible
Whitehaven and Workington 1.2 MW64 MWnot visible
Westmorland and Lonsdale 5.3 MW26 MWnot visible

Bishop Auckland next door has 52 MW waiting, more than Penrith and Solway's 4.7 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 3 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.