Nottingham South
Nottingham South has 6.7 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 2,400 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,334 homes.
Ranks 245 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Boots Campus - Roof Top Solar FarmBoots Company Plc | Solar | 6.3 MW2,300 homes | Approved 4 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 22/01231/PFUL3 |
| Eastcroft EfW (3rd Line)FCC Environment | EfW Incineration | 3 MW | Approved 11 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 15/02548/PMFUL3 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Nottingham South | 6.7 MW | 2.2 MW | not visible |
| Rushcliffe | 163 MW | 24 MW | not visible |
| Nottingham East | 0 MW | 0 MW | not visible |
| Broxtowe | 0 MW | 2.5 MW | not visible |
| Nottingham North and Kimberley | 17 MW | 0 MW | not visible |
Rushcliffe next door has 163 MW waiting, more than Nottingham South's 6.7 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.