North Devon

MP: Ian Roome (Liberal Democrat) England Data to July 2026

North Devon has 8.4 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 3,100 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.0m across the constituency's 43,197 homes. There is also 84 MW of wind running here on the local network. If that gets switched off, no national record shows it.

Ranks 233 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Buttercombe Lane - Solar FarmExagen Development Limited Solar 15 MW5,400 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 80182
Perrigo, Exeter Road - Solar PanelsWrafton Laboratories (Trading as Perrigo) Solar 5.9 MW2,100 homes Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 76423
Petroc, Sticklepath - Battery StoragePetroc College Of Further Education Battery 1 MW Waiting 24 months for a planning decisionWho can move it: North Devon Council · planning ref 78929

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
North Devon 8.4 MW201 MWnot visible
Tiverton and Minehead 107 MW56 MWnot visible
Central Devon 11 MW41 MWnot visible
Torridge and Tavistock 70 MW188 MWnot visible

Tiverton and Minehead next door has 107 MW waiting, more than North Devon's 8.4 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 3 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.