CONSTITUENCY BRIEFING · ENERGYMAP.APP
Luton North
Luton North has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 39,994 homes.
Ranks 458 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Luton North | 0.7 MW | 0 MW | not visible |
| Luton South and South Bedfordshire | 4.5 MW | 18 MW | not visible |
| Dunstable and Leighton Buzzard | 76 MW | 13 MW | not visible |
| Hitchin | 50 MW | 33 MW | not visible |
| Mid Bedfordshire | 43 MW | 14 MW | not visible |
Dunstable and Leighton Buzzard next door has 76 MW waiting, more than Luton North's 0.7 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.