CONSTITUENCY BRIEFING · ENERGYMAP.APP
Liverpool West Derby
Liverpool West Derby has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,178 homes.
Ranks 491 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Lister Battery Limited - Battery Energy Storage SystemLister Battery Limited | Battery | 6 MW | Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 24F/2904 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Liverpool West Derby | 0.5 MW | 0 MW | not visible |
| Liverpool Wavertree | 0 MW | 0 MW | not visible |
| Liverpool Riverside | 3 MW | 0 MW | not visible |
| Knowsley | 1.5 MW | 0.8 MW | not visible |
| Liverpool Walton | 0 MW | 0 MW | not visible |
Liverpool Riverside next door has 3 MW waiting, more than Liverpool West Derby's 0.5 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.