Huntingdon
Huntingdon has 32 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 12,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.2m across the constituency's 45,645 homes. There is also 60 MW of wind running here on the local network. If that gets switched off, no national record shows it.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Red House Farm - Solar FarmNw/O Red House Farm On Double, Bank Lane, Sawtry, Huntingdon | Solar Photovoltaics | 7,300 homes | 20.0 MW | 2021-12 | 4.6 yrs |
| Bicton Industrial Park, Stow Road - Solar FarmWest Of Bicton Industrial Park Stow Road Kimbolton | Solar Photovoltaics | 2,900 homes | 8.0 MW | 2023-12 | 2.7 yrs |
| Alconbury Packing Solutions - Solar PanelsAlconbury Packing Solutions Pierson Road Enterprise Campus Alconbury Weald Huntingdon | Solar Photovoltaics | 400 homes | 1.0 MW | 2022-07 | 4.1 yrs |
| Founders House, Pierson Road - Solar PanelsFounders House Pierson Road Enterprise Campus Alconbury Weald | Solar Photovoltaics | 400 homes | 1.0 MW | 2023-01 | 3.5 yrs |
| Latham Road - Solar Panels2 Latham Road | Solar Photovoltaics | 300 homes | 0.9 MW | 2024-07 | 2.0 yrs |
| Tick Fen Farm, Puddock Road - Wind TurbineField South Of Tick Fen Farm Puddock Road Warboys | Wind Onshore | 400 homes | 0.5 MW | 2024-05 | 2.2 yrs |
| Colne Fen Farm, Chatteris Road - Solar PanelsColne Fen Farm, Chatteris Road, Somersham, Huntingdon | Solar Photovoltaics | 200 homes | 0.5 MW | 2024-04 | 2.3 yrs |
| Needingworth Road - Solar Photovoltaic ArrayW M Morrison Supermarket Needingworth Road St Ives | Solar Photovoltaics | 100 homes | 0.4 MW | 2022-01 | 4.6 yrs |
| Lancaster House, Lancaster Way - Solar PanelsLancaster House, Lancaster Way, Ermine Business Park, Huntingdon | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-01 | 2.6 yrs |
Plus 7 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| East Park Energy | 100 MW | in planning | could supply ≈350,000 homes |
| Rookery Farm, Kimbolton Road - Battery Storage Facility | 50 MW | approved, not built 2025 | could supply ≈175,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Ben Obese-Jecty said about the grid in Parliament? Search Hansard →