CONSTITUENCY BRIEFING · ENERGYMAP.APP
Hendon
Hendon has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.4m across the constituency's 48,200 homes.
Ranks 569 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Hendon | 0 MW | 0 MW | not visible |
| Brent East | 13 MW | 0 MW | not visible |
| Harrow East | 0 MW | 0 MW | not visible |
| Finchley and Golders Green | 0.5 MW | 0 MW | not visible |
| Chipping Barnet | 0.2 MW | 0 MW | not visible |
| Hertsmere | 1.4 MW | 13 MW | not visible |
Brent East next door has 13 MW waiting, more than Hendon's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.