CONSTITUENCY BRIEFING · ENERGYMAP.APP

Harrogate and Knaresborough

MP: Tom Gordon (Liberal Democrat) England Data to July 2026

Harrogate and Knaresborough has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.1m across the constituency's 45,004 homes.

Ranks 475 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Low Moor Lane, Scotton - Battery Energy Storage SystemHarmony Energy Limited Battery 200 MW Applied in 2025, still waiting for a decisionWho can move it: North Yorkshire Council · planning ref 25/04454/FULMAJ
Wormald Green Solar FarmHarmony Energy Limited Solar 43 MW16,000 homes Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref ZC23/04361/EIAMAJ
Jenny Field DriveEnstor Power Battery 5 MW Approved 9 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 17/04644/FUL

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Harrogate and Knaresborough 0.6 MW0 MWnot visible
Wetherby and Easingwold 2.2 MW40 MWnot visible
Skipton and Ripon 63 MW29 MWnot visible

Skipton and Ripon next door has 63 MW waiting, more than Harrogate and Knaresborough's 0.6 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.