Gravesham
Gravesham has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,724 homes.
Ranks 453 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Thames Way, Northfleet - Battery Energy StorageSpeedgreen Limited | Battery | 100 MW | Applied in 2025, still waiting for a decisionWho can move it: Gravesham Council · planning ref 20250730 |
| Northfleet Mill, Crete Hall Road - Green Hydrogen ElectrolyserHYRO Energy Limited (Octopus & RES) | Hydrogen | 15 MW | Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 20250251 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Gravesham | 0.8 MW | 0 MW | not visible |
| Tonbridge | 11 MW | 4.7 MW | not visible |
| Chatham and Aylesford | 1 MW | 4.5 MW | not visible |
| Rochester and Strood | 1.7 MW | 12 MW | not visible |
| Dartford | 4.7 MW | 0 MW | not visible |
Tonbridge next door has 11 MW waiting, more than Gravesham's 0.8 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.