CONSTITUENCY BRIEFING · ENERGYMAP.APP

Gravesham

MP: Dr Lauren Sullivan (Labour) England Data to July 2026

Gravesham has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,724 homes.

Ranks 453 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Thames Way, Northfleet - Battery Energy StorageSpeedgreen Limited Battery 100 MW Applied in 2025, still waiting for a decisionWho can move it: Gravesham Council · planning ref 20250730
Northfleet Mill, Crete Hall Road - Green Hydrogen ElectrolyserHYRO Energy Limited (Octopus & RES) Hydrogen 15 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 20250251

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Gravesham 0.8 MW0 MWnot visible
Tonbridge 11 MW4.7 MWnot visible
Chatham and Aylesford 1 MW4.5 MWnot visible
Rochester and Strood 1.7 MW12 MWnot visible
Dartford 4.7 MW0 MWnot visible

Tonbridge next door has 11 MW waiting, more than Gravesham's 0.8 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.