CONSTITUENCY BRIEFING · ENERGYMAP.APP

Gateshead Central and Whickham

MP: Mark Ferguson (Labour) England Data to July 2026

Gateshead Central and Whickham has 3.4 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,200 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.1m across the constituency's 44,309 homes.

Ranks 290 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Albany Road - Solar ArraySolar Advanced Systems Limited T A Sas Energy Solar 2 MW700 homes Approved 5 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref DC/21/01206/FUL

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Gateshead Central and Whickham 3.4 MW0 MWnot visible
North Durham 0.9 MW28 MWnot visible
Washington and Gateshead South 26 MW16 MWnot visible
Blaydon and Consett 6.6 MW0.4 MWnot visible
Jarrow and Gateshead East 5 MW0 MWnot visible

Washington and Gateshead South next door has 26 MW waiting, more than Gateshead Central and Whickham's 3.4 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.