CONSTITUENCY BRIEFING · ENERGYMAP.APP

Erith and Thamesmead

MP: Ms Abena Oppong-Asare (Labour) England Data to July 2026

Erith and Thamesmead has 1.6 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 600 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.6m across the constituency's 49,618 homes.

Ranks 362 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Riverside Energy Park (REP)Cory Riverside Energy EfW Incineration 80 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref EN010093
Riverside Energy ParkCory Riverside Energy Battery 20 MW Approved 6 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref EN010093
Riverside Energy Park (REP)Cory Riverside Energy Anaerobic Digestion 19 MW Approved 6 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref EN010093
Riverside Resource Recovery Facility Battery StorageRiverside Resource Recovery Limited Battery 2.5 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 20/03208/FUL
Riverside Energy Park (REP)Cory Riverside Energy Solar 1 MW400 homes Approved 6 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref EN010093

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Erith and Thamesmead 1.6 MW4.6 MWnot visible
Eltham and Chislehurst 0.2 MW0 MWnot visible
Greenwich and Woolwich 4.5 MW1 MWnot visible
Old Bexley and Sidcup 0.3 MW0 MWnot visible
Bexleyheath and Crayford 0.2 MW0 MWnot visible

Greenwich and Woolwich next door has 4.5 MW waiting, more than Erith and Thamesmead's 1.6 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.