CONSTITUENCY BRIEFING · ENERGYMAP.APP

East Thanet

MP: Ms Polly Billington (Labour) England Data to July 2026

East Thanet has 1.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 500 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 46,212 homes.

Ranks 389 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Sacketts Hill Farm - Battery Energy Storage SystemGreenfield Limited Battery 22 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref F/TH/24/0575

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
East Thanet 1.3 MW0.6 MWnot visible
Herne Bay and Sandwich 2.2 MW129 MWnot visible

Herne Bay and Sandwich next door has 2.2 MW waiting, more than East Thanet's 1.3 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.