Croydon South
Croydon South has no large renewable or battery projects in the planning database. Its households still pay for Britain's grid bottlenecks: about £92 a year per household, £3.6m across the constituency's 39,671 homes.
Ranks 569 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Croydon South | 0 MW | 0 MW | not visible |
| East Surrey | 11 MW | 0 MW | not visible |
| Reigate | 0.3 MW | 0 MW | not visible |
| Carshalton and Wallington | 0 MW | 0 MW | not visible |
| Croydon East | 0 MW | 0 MW | not visible |
| Croydon West | 0 MW | 0 MW | not visible |
East Surrey next door has 11 MW waiting, more than Croydon South's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.