Colchester has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.3m across the constituency's 47,253 homes.
Ranks 499 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Stephenson Road - Urban Reserve Flexible Energy FacilityAMP Energy Services LImited | Battery | 6 MW | Approved 4 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 221033 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Colchester | 0.5 MW | 0 MW | not visible |
| Witham | 24 MW | 193 MW | not visible |
| Harwich and North Essex | 21 MW | 68 MW | not visible |
Witham next door has 24 MW waiting, more than Colchester's 0.5 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call