CONSTITUENCY BRIEFING · ENERGYMAP.APP
Chesterfield
Chesterfield has 1.5 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 600 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,402 homes.
Ranks 371 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Chesterfield | 1.5 MW | 39 MW | not visible |
| North East Derbyshire | 50 MW | 9 MW | not visible |
| Bolsover | 35 MW | 48 MW | not visible |
North East Derbyshire next door has 50 MW waiting, more than Chesterfield's 1.5 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.