CONSTITUENCY BRIEFING · ENERGYMAP.APP
Brighton Pavilion
Brighton Pavilion has no large renewable or battery projects in the planning database. Its households still pay for Britain's grid bottlenecks: about £92 a year per household, £4.0m across the constituency's 43,844 homes.
Ranks 569 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Brighton Pavilion | 0 MW | 0 MW | not visible |
| Lewes | 26 MW | 42 MW | not visible |
| Brighton Kemptown and Peacehaven | 0 MW | 0 MW | not visible |
| Hove and Portslade | 0 MW | 1.8 MW | not visible |
| Mid Sussex | 0.2 MW | 5 MW | not visible |
Lewes next door has 26 MW waiting, more than Brighton Pavilion's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.