CONSTITUENCY BRIEFING · ENERGYMAP.APP

Brighton Pavilion

MP: Siân Berry (Green Party) England Data to July 2026

Brighton Pavilion has no large renewable or battery projects in the planning database. Its households still pay for Britain's grid bottlenecks: about £92 a year per household, £4.0m across the constituency's 43,844 homes.

Ranks 569 of 650 for clean power approved and not built.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Brighton Pavilion 0 MW0 MWnot visible
Lewes 26 MW42 MWnot visible
Brighton Kemptown and Peacehaven 0 MW0 MWnot visible
Hove and Portslade 0 MW1.8 MWnot visible
Mid Sussex 0.2 MW5 MWnot visible

Lewes next door has 26 MW waiting, more than Brighton Pavilion's 0 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call