No.311 of 650 · approved, not built MP: Peter Dowd (Labour) England

Bootle

Bootle has 2.7 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.1m across the constituency's 44,869 homes.

Not visible
here
13 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
2.7 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 1,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.2× the renewable capacity actually running here.
18 projects · planning database (REPD), July 2026 · how we worked this out
£4.1m
is what the grid gap costs this constituency's 44,869 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 18 waiting projects · years since approval
Rubies 1 Building, Royal Seaforth Dock - Solar Panels
2.5 YRS
Royal Seaforth Dock, New Jenkins Sheds - Solar Panels 2 MW
2.4 YRS
Merlin AFS, Royal Seaforth Dock - Solar Panels 0.2 MW
2.4 YRS
Rubies 2 Building, Royal Seaforth Dock - Solar Panels
2.4 YRS
Cwt Maintenance Building, Regent Road - Solar Panels
2.4 YRS
Multiuser 2 Building, Regent Road - Solar Panels
2.4 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Royal Seaforth Dock, New Jenkins Sheds - Solar PanelsNew Jenkins Sheds, 2 Royal Seaforth Dock, BootleSolar Photovoltaics700 homes2.0 MW2024-022.4 yrs
Royal Seaforth Dock, New Jenkins Sheds - Solar PanelsNew Jenkins Sheds 2 Regent RoadSolar Photovoltaics100 homes0.3 MW2024-022.4 yrs
Merlin AFS, Royal Seaforth Dock - Solar PanelsMerlin Afs 2 Building, Royal Seaforth Dock, LiverpoolSolar Photovoltaics100 homes0.2 MW2024-022.4 yrs
CWT North Building, Royal Seaforth Dock - Solar panelsCwt North Building, Royal Seaforth Dock, LiverpoolSolar Photovoltaics100 homes0.1 MW2024-022.4 yrs
Royal Seaforth Dock, CWT Stores Building - Solar PanelsCWT Stores Building Royal Seaforth Dock WaterlooSolar Photovoltaics— MW2024-032.4 yrs
Multiuser 4 Building - Solar PanelsMultiuser 4 Building BootleSolar Photovoltaics— MW2024-022.4 yrs
Multiuser 1 Building, Regent Road - Solar PanelsMultiuser 1 Building Regent RoadSolar Photovoltaics— MW2024-022.4 yrs
Maritime Stores, Royal Seaforth Dock - Solar PanelsMaritime Stores Royal Seaforth Dock SeaforthSolar Photovoltaics— MW2024-032.4 yrs
Rubies 1 Building, Royal Seaforth Dock - Solar PanelsRubies 1 Building Royal Seaforth Dock SeaforthSolar Photovoltaics— MW2024-022.5 yrs
Rubies 2 Building, Royal Seaforth Dock - Solar PanelsRubies 2 Building Royal Seaforth Dock SeaforthSolar Photovoltaics— MW2024-022.4 yrs
Cwt Maintenance Building, Regent Road - Solar PanelsCWT Maintenance Building Regent RoadSolar Photovoltaics— MW2024-022.4 yrs
Briggs Marine, Langton Dock - Solar PanelsBriggs Marine, Bootle, LiverpoolSolar Photovoltaics— MW2024-032.4 yrs
Multiuser 2 Building, Regent Road - Solar PanelsMultiuser 2, Bootle, LiverpoolSolar Photovoltaics— MW2024-022.4 yrs
Temp Control Building - Solar PanelsTemp Control Building, BootleSolar Photovoltaics— MW2024-032.4 yrs
Maritime IT Building, Royal Seaforth Dock - Solar PanelsMaritime It Building, Royal Seaforth Dock, Waterloo, LiverpoolSolar Photovoltaics— MW2024-032.4 yrs
Royal Seaforth Dock, Seaforth - Solar Photovoltaic PanelsContainer Building Royal Seaforth Dock SeaforthSolar Photovoltaics— MW2024-022.4 yrs
Royal Seaforth Dock - Solar PanelsMultiuser 3 Building, Royal Seaforth Dock, BootleSolar Photovoltaics— MW2024-022.4 yrs
Multiuser 5 Building, Royal Seaforth Dock - Solar PanelsMultiuser 5 Building Royal Seaforth DockSolar Photovoltaics— MW2024-032.4 yrs

Plus 1 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Hawthorne Road20 MWbeing built 2022could supply ≈70,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Peter Dowd said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)