Blackpool North and Fleetwood

MP: Lorraine Beavers (Labour) England Data to July 2026

Blackpool North and Fleetwood has 1 MW of renewables running, enough for 500 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,949 homes.

Ranks 569 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Bristol Avenue - Battery Energy Storage FacilityHenco International Limited Battery 25 MW Approved 5 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 21/0246
Hillhouse Business Park - Thornton Energy Recovery CentreSesona Limited EfW Incineration 9.3 MW Waiting 3.5 years for a planning decisionWho can move it: Wyre Council · planning ref LCC/2023/0003

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Blackpool North and Fleetwood 0 MW1.3 MWnot visible
Fylde 26 MW31 MWnot visible
Blackpool South 0.8 MW0 MWnot visible

Fylde next door has 26 MW waiting, more than Blackpool North and Fleetwood's 0 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.