CONSTITUENCY BRIEFING · ENERGYMAP.APP

Aldershot

MP: Alex Baker (Labour) England Data to July 2026

Aldershot has 1.8 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 700 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 46,171 homes.

Ranks 353 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Farnborough International Exhibition Centre, Etps Road - Solar PanelsFarnborough International Limited Solar 1.1 MW400 homes Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 23/00885/FULPP

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Aldershot 1.8 MW1.7 MWnot visible
Farnham and Bordon 1.4 MW0 MWnot visible
Godalming and Ash 1 MW2 MWnot visible
Surrey Heath 0 MW0 MWnot visible
Bracknell 0 MW0 MWnot visible
North East Hampshire 168 MW11 MWnot visible

North East Hampshire next door has 168 MW waiting, more than Aldershot's 1.8 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.