Aldershot has 1.8 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 700 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 46,171 homes.
Ranks 353 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Farnborough International Exhibition Centre, Etps Road - Solar PanelsFarnborough International Limited | Solar | 1.1 MW400 homes | Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 23/00885/FULPP |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Aldershot | 1.8 MW | 1.7 MW | not visible |
| Farnham and Bordon | 1.4 MW | 0 MW | not visible |
| Godalming and Ash | 1 MW | 2 MW | not visible |
| Surrey Heath | 0 MW | 0 MW | not visible |
| Bracknell | 0 MW | 0 MW | not visible |
| North East Hampshire | 168 MW | 11 MW | not visible |
North East Hampshire next door has 168 MW waiting, more than Aldershot's 1.8 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.