 "pcon24cd": "W07000086",
 "name": "Bridgend",
 "nation": "Wales",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 7.5,
   "sites": 2
  }
 },
 "number2": {
  "stuck_mw": 0.8,
  "stuck_mw_int": 1,
  "stuck_sites": 1,
  "homes_equivalent": 300,
  "homes_vs_seat_households": 0.01,
  "stuck_mw_12m_cut": 40.8,
  "consented_not_built_mw_any_age": 40.8,
  "operational_mw": 28.0,
  "operational_homes_equivalent": 14000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 2.2,
  "rank": 447,
  "tech_mix": {
   "solar": 0.8
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.0,
  "projects": [
   {
    "site_name": "Ty\u2019n y Waun  - Solar Farm (Bridgend Energy Hub)",
    "address": "Btw Heol Laethog and Heol Y Cyw, Bridgend",
    "repd_ref_id": 10299,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 40.0,
    "homes_equivalent": 15000,
    "consented": "2024-10-11",
    "months_waiting": 21.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "SAS International, Unit 1 -  Solar PV Panels",
    "address": "SAS International Parc Crescent Waterton Industrial Estate, Bridgend",
    "repd_ref_id": 9541,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.8,
    "homes_equivalent": 300,
    "consented": "2021-10-25",
    "months_waiting": 57.3,
    "status": "Under Construction"
   },
   {
    "site_name": "Atlantic Plastics, Coytrahen Close - Solar Panels",
    "address": "Atlantic Plastics Ltd Coytrahen Close Brackla Industrial Estate",
    "repd_ref_id": 20724,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2026-04-23",
    "months_waiting": 3.4,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 40589,
  "seat_total_gbp": 3700000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": []
 },
 "pipeline_projects": [
  {
   "site_name": "Ty\u2019n y Waun  - Solar Farm (Bridgend Energy Hub)",
   "repd_ref_id": 10299,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 40.0,
   "homes_equivalent": 15000,
   "status": "Awaiting Construction",
   "consented": "2024-10-11",
   "refused": null,
   "planning_authority": "Welsh Government (NSIP)",
   "planning_ref": "DNS/3279521",
   "operator": "Cenin Renewables Limited",
   "address": "Btw Heol Laethog and Heol Y Cyw, Bridgend",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-10-11",
     "years_since_consent": 1.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "HyBont Green Hydrogen",
   "repd_ref_id": 14803,
   "technology": "Hydrogen",
   "capacity_mw": 6.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-03-27",
   "refused": null,
   "planning_authority": "Bridgend",
   "planning_ref": "P/23/218/FUL",
   "operator": "Hygen Energy Holdings",
   "address": "Brynmenyn and Bryncethin, Bridgend",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-03-27",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hendir Uchaf Farm, Minffrwd Road - Solar Array",
   "repd_ref_id": 20312,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.5,
   "homes_equivalent": 500,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Bridgend",
   "planning_ref": "P/25/717/FUL",
   "operator": "Shillibier Limited",
   "address": "Hendir Uchaf Farm Rhiwceiliog",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "Bridgend Council",
    "evidence": {
     "submitted": "2025-12-18",
     "months_waiting": 7
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "W07000081",
  "W07000110",
  "W07000106",
  "W07000107"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}