{
 "pcon24cd": "S14000103",
 "name": "Perth and Kinross-shire",
 "nation": "Scotland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 19.6,
   "sites": 2
  }
 },
 "number2": {
  "stuck_mw": 43.3,
  "stuck_mw_int": 43,
  "stuck_sites": 8,
  "homes_equivalent": 17000,
  "homes_vs_seat_households": 0.37,
  "stuck_mw_12m_cut": 43.3,
  "consented_not_built_mw_any_age": 43.3,
  "operational_mw": 44.0,
  "operational_homes_equivalent": 33000,
  "refused_5y_mw": 49.9,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 4.0,
  "rank": 154,
  "tech_mix": {
   "solar": 40.0,
   "onshore wind": 3.3
  },
  "tech_summary": "almost all solar",
  "waiting_vs_running": 1.0,
  "projects": [
   {
    "site_name": "Shire-End Farm",
    "address": "Shire-End Farm, Forgandenny, Perth, Tayside",
    "repd_ref_id": 4950,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 17.0,
    "homes_equivalent": 6200,
    "consented": "2016-02-18",
    "months_waiting": 125.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Standingfauld Farm, Muthill - Solar Panels",
    "address": "300 Metres SE/O Standingfauld Farm Muthill",
    "repd_ref_id": 11900,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 14.0,
    "homes_equivalent": 5100,
    "consented": "2022-11-08",
    "months_waiting": 44.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Binn Eco Park - Solar",
    "address": "150 Metres Ne/O Binn Hill, Transmitting Station, Glenfarg, Perth",
    "repd_ref_id": 9071,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 5.0,
    "homes_equivalent": 1800,
    "consented": "2021-09-29",
    "months_waiting": 58.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Simon Howie Butchers, Findony Farm - Wind Turbine",
    "address": "Simon Howie Butchers Findony Farm Dunning",
    "repd_ref_id": 15147,
    "technology": "Wind Onshore",
    "capacity_mw": 2.3,
    "homes_equivalent": 2000,
    "consented": "2024-04-12",
    "months_waiting": 27.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The James Hutton Institute - Solar PV Array",
    "address": "The James Hutton Institute, Errol Road, Invergowrie, Dundee",
    "repd_ref_id": 9817,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.0,
    "homes_equivalent": 700,
    "consented": "2022-01-19",
    "months_waiting": 54.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Findony Farm, Dunning - Solar Array",
    "address": "Findony Farm Dunning",
    "repd_ref_id": 12755,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.0,
    "homes_equivalent": 700,
    "consented": "2023-01-18",
    "months_waiting": 42.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Pitheavlis - Wind Turbine",
    "address": "Aviva Headquarters Pitheavlis",
    "repd_ref_id": 10900,
    "technology": "Wind Onshore",
    "capacity_mw": 1.0,
    "homes_equivalent": 900,
    "consented": "2022-10-14",
    "months_waiting": 45.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels",
    "address": "Almondbank, Perth",
    "repd_ref_id": 14663,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2023-10-04",
    "months_waiting": 34.0,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 47153,
  "seat_total_gbp": 4300000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 49.0,
  "building_mw": 0.0,
  "approved_mw": 274.5,
  "approved_24m_mw": 224.6,
  "refused_mw": 49.9,
  "submitted_mw": 185.9,
  "sites": [
   {
    "site_name": "Brunt Hill Wind Farm & Battery Storage",
    "capacity_mw": 50.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Glentarken Wind Farm",
    "capacity_mw": 50.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Newhouse Farm - Energy Storage Facility",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Newburgh Road, Abernethy - Battery Storage",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2022,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Taigh An Struith, Tibbermore - Battery Energy Storage",
    "capacity_mw": 49.9,
    "status": "refused",
    "year": 2025,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Old Gallows Road - Battery storage",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2021,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Jamesfield Garden Centre, Newburgh - Battery Energy Storage",
    "capacity_mw": 49.9,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Newburgh Road, Abernethy - Battery Energy Storage Facility",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Jamesfield Organic Centre - Battery Storage",
    "capacity_mw": 49.0,
    "status": "operating",
    "year": 2022,
    "homes_while_discharging": 172000
   },
   {
    "site_name": "Cordon Farm, Abernethy - Battery Storage",
    "capacity_mw": 30.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 105000
   },
   {
    "site_name": "Newburgh Road, Abernethy - Energy Storage",
    "capacity_mw": 15.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 53000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Brunt Hill Wind Farm & Battery Storage",
   "repd_ref_id": 12824,
   "technology": "Wind Onshore",
   "capacity_mw": 129.6,
   "homes_equivalent": 113000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004654",
   "operator": "E Power Limited",
   "address": "4.5km Nw/O Kinross, Kinross",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 2.2 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-05-08",
     "months_waiting": 27
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2031",
   "tec": {
    "project": "Brunt Hill Wind Farm",
    "connection_date": "2031-10-31",
    "connection_year": 2031,
    "mw": 99.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Glentarken Wind Farm",
   "repd_ref_id": 13002,
   "technology": "Wind Onshore",
   "capacity_mw": 104.0,
   "homes_equivalent": 91000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004700",
   "operator": "SSE Renewables Wind Farms UK Ltd",
   "address": "Drummond Estate, Drummond, Perth",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 18 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-01-21",
     "months_waiting": 18
    },
    "all_matches": [
     "planning_overdue",
     "gate2",
     "connection_date"
    ]
   },
   "earliest": "2031",
   "tec": {
    "project": "Glentarken Wind Farm",
    "connection_date": "2031-11-30",
    "connection_year": 2031,
    "mw": 104.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Dupplin Solar - Solar Array",
   "repd_ref_id": 20768,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 97.5,
   "homes_equivalent": 35000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006264",
   "operator": "BLC Energy",
   "address": "Dupplin Solar 750 Metres S/O Newbigging Farm Tibbermore",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2026-03-30",
     "months_waiting": 4
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Brunt Hill Wind Farm & Battery Storage",
   "repd_ref_id": 12825,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004654",
   "operator": "E Power Limited",
   "address": "4.5km Nw/O Kinross, Kinross",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 2.2 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-05-08",
     "months_waiting": 27
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Glentarken Wind Farm",
   "repd_ref_id": 18296,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004700",
   "operator": "SSE Renewables Wind Farms UK Ltd",
   "address": "Drummond Estate, Drummond, Perth",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 18 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-01-21",
     "months_waiting": 18
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Newburgh Road, Abernethy - Battery Energy Storage Facility",
   "repd_ref_id": 16286,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-05-15",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "24/01386/FLM",
   "operator": "Opdenergy",
   "address": "200 Metres N/O Pitcurran House, Newburgh Road, Abernethy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-05-15",
     "years_since_consent": 1.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kinnon Park Farm, Methven - Solar Farm & Battery Storage",
   "repd_ref_id": 14664,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Refused",
   "consented": null,
   "refused": "2026-05-13",
   "planning_authority": "Perth and Kinross",
   "planning_ref": "24/01188/FLM",
   "operator": "Namene Solar",
   "address": "Kinnon Park Farm, Methven, Perth",
   "reason": {
    "reason": "refused",
    "label": "Refused by Perth and Kinross Council in 2026",
    "who": "Perth and Kinross Council",
    "evidence": {
     "refusal_date": "2026-05-13"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage",
   "repd_ref_id": 13595,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-12-20",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "23/00539/FULM",
   "operator": "Epsilon Generation",
   "address": "Dormitories Star Inn Farm C12 From A90 At Star Inn Farm To U329 At Mains Of Fowlis",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-12-20",
     "years_since_consent": 2.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Newburgh Road, Abernethy - Battery Storage",
   "repd_ref_id": 10607,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-09-26",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "22/00746/FLM",
   "operator": "CBS Solar Assets UK Limited",
   "address": "60 Metres North Of Abernethy Cemetery Newburgh Road Abernethy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-09-26",
     "years_since_consent": 3.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Newhouse Farm - Energy Storage Facility",
   "repd_ref_id": 9047,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-01-27",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "22/01071/FLM",
   "operator": "Intelligent Land Investments Group",
   "address": "170 Metres S/O Newhouse Farm, Perth",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-01-27",
     "years_since_consent": 3.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Old Gallows Road - Battery storage",
   "repd_ref_id": 8368,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2021-08-03",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "21/00235/FLM",
   "operator": "Foresight Group",
   "address": "Old Gallows Road",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-08-03",
     "years_since_consent": 5.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Jamesfield Garden Centre, Newburgh - Battery Energy Storage",
   "repd_ref_id": 19734,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "26/00067/FLM",
   "operator": "Harmony Energy Limited",
   "address": "300 Metres Nw/O Jamesfield Garden Centre, Newburgh, Cupar",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "Perth and Kinross Council",
    "evidence": {
     "submitted": "2026-02-06",
     "months_waiting": 6
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Taigh An Struith, Tibbermore - Battery Energy Storage",
   "repd_ref_id": 15754,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-03-12",
   "planning_authority": "Perth and Kinross",
   "planning_ref": "24/00750/FLM",
   "operator": "Ylem Energy Limited",
   "address": "256 Metres Sw/O Taigh An Struith, Tibbermore, Perth",
   "reason": {
    "reason": "refused",
    "label": "Refused by Perth and Kinross Council in 2025",
    "who": "Perth and Kinross Council",
    "evidence": {
     "refusal_date": "2025-03-12"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Binn Farm Solar Farm",
   "repd_ref_id": 19595,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 39.0,
   "homes_equivalent": 14000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "25/01836/FLM",
   "operator": "Trio Power Limited",
   "address": "Binn Farm, Glenfarg, Perth",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2035",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Binn Solar  Farm",
     "connection_date": "2035-10-31",
     "mw": 30.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "in_planning"
    ]
   },
   "earliest": "2035",
   "tec": {
    "project": "Binn Solar  Farm",
    "connection_date": "2035-10-31",
    "connection_year": 2035,
    "mw": 30.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Cordon Farm, Abernethy - Battery Storage",
   "repd_ref_id": 12903,
   "technology": "Battery",
   "capacity_mw": 30.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "24/01558/FLM",
   "operator": "Elgin Energy EsCo Limited",
   "address": "600 Metres North East Of Cordon Farm Abernethy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 21 months for a planning decision",
    "who": "Perth and Kinross Council",
    "evidence": {
     "submitted": "2024-10-30",
     "months_waiting": 21
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Shire-End Farm",
   "repd_ref_id": 4950,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 17.0,
   "homes_equivalent": 6200,
   "status": "Awaiting Construction",
   "consented": "2016-02-18",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "14/02077/FLL",
   "operator": "Qair Scotland Limited",
   "address": "Shire-End Farm, Forgandenny, Perth, Tayside",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2033, 17 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Shire End Solar Farm",
     "connection_date": "2033-10-31",
     "mw": 20.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2033",
   "tec": {
    "project": "Shire End Solar Farm",
    "connection_date": "2033-10-31",
    "connection_year": 2033,
    "mw": 20.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Newburgh Road, Abernethy - Energy Storage",
   "repd_ref_id": 13111,
   "technology": "Battery",
   "capacity_mw": 15.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-03-29",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "22/02217/FLL",
   "operator": "Centrica Business Solutions",
   "address": "110 Metres Ne/O Abernethy Cemetery, Abernethy Cemetery, Newburgh Road, Abernethy, Perth",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-03-29",
     "years_since_consent": 3.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Standingfauld Farm, Muthill - Solar Panels",
   "repd_ref_id": 11900,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 14.0,
   "homes_equivalent": 5100,
   "status": "Awaiting Construction",
   "consented": "2022-11-08",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "22/01179/FLL",
   "operator": "Relay Standingfauld Limited",
   "address": "300 Metres SE/O Standingfauld Farm Muthill",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-11-08",
     "years_since_consent": 3.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Binn Eco Park - Battery",
   "repd_ref_id": 9098,
   "technology": "Battery",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2021-07-12",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "21/00834/FLL",
   "operator": "Green Cat Renewables Developments",
   "address": "Binn Eco Park Wind Farm Glenfarg",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2028, 7 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Binn Ecopark",
     "connection_date": "2028-10-31",
     "mw": 9.9,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Binn Ecopark",
    "connection_date": "2028-10-31",
    "connection_year": 2028,
    "mw": 9.9,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Binn Eco Park - EfW",
   "repd_ref_id": 7807,
   "technology": "EfW Incineration",
   "capacity_mw": 7.3,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2020-12-17",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "20/01242/FLM",
   "operator": "Binn Group",
   "address": "Binn Farm, Glenfarg, Perth, Tayside",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Binn Farm Solar Farm",
   "repd_ref_id": 19596,
   "technology": "Battery",
   "capacity_mw": 6.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "25/01836/FLM",
   "operator": "Trio Power Limited",
   "address": "Binn Farm, Glenfarg, Perth",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "Perth and Kinross Council",
    "evidence": {
     "submitted": "2026-01-20",
     "months_waiting": 6
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Binn Eco Park - Solar",
   "repd_ref_id": 9071,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 5.0,
   "homes_equivalent": 1800,
   "status": "Awaiting Construction",
   "consented": "2021-09-29",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "21/00705/FLL",
   "operator": "Green Cat Renewables Developments",
   "address": "150 Metres Ne/O Binn Hill, Transmitting Station, Glenfarg, Perth",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-09-29",
     "years_since_consent": 4.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Binn Eco Park",
   "repd_ref_id": 926,
   "technology": "Advanced Conversion Technologies",
   "capacity_mw": 4.6,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2011-10-20",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "10/01767/FLM",
   "operator": "SITA UK/Binn Group",
   "address": "Glenfarg, Perthshire",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 15 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2011-10-20",
     "years_since_consent": 14.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Simon Howie Butchers, Findony Farm - Wind Turbine",
   "repd_ref_id": 15147,
   "technology": "Wind Onshore",
   "capacity_mw": 2.3,
   "homes_equivalent": 2000,
   "status": "Awaiting Construction",
   "consented": "2024-04-12",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "23/01665/FLL",
   "operator": "Simon Howie Butchers Limited",
   "address": "Simon Howie Butchers Findony Farm Dunning",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-04-12",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "The James Hutton Institute - Solar PV Array",
   "repd_ref_id": 9817,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.0,
   "homes_equivalent": 700,
   "status": "Awaiting Construction",
   "consented": "2022-01-19",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "21/01612/FLL",
   "operator": "Dundee Renewable Energy Society",
   "address": "The James Hutton Institute, Errol Road, Invergowrie, Dundee",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-01-19",
     "years_since_consent": 4.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Findony Farm, Dunning - Solar Array",
   "repd_ref_id": 12755,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.0,
   "homes_equivalent": 700,
   "status": "Awaiting Construction",
   "consented": "2023-01-18",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "22/01925/FLL",
   "operator": "Simon Howie Butchers Limited",
   "address": "Findony Farm Dunning",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-01-18",
     "years_since_consent": 3.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Pitheavlis - Wind Turbine",
   "repd_ref_id": 10900,
   "technology": "Wind Onshore",
   "capacity_mw": 1.0,
   "homes_equivalent": 900,
   "status": "Awaiting Construction",
   "consented": "2022-10-14",
   "refused": null,
   "planning_authority": "Perth and Kinross",
   "planning_ref": "22/00390/FLL",
   "operator": "Aviva Central Services UK Limited",
   "address": "Aviva Headquarters Pitheavlis",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-10-14",
     "years_since_consent": 3.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000105",
  "S14000076",
  "S14000090",
  "S14000100",
  "S14000075",
  "S14000065"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}