 "pcon24cd": "S14000072",
 "name": "Cumbernauld and Kirkintilloch",
 "nation": "Scotland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 1.2,
  "stuck_mw_int": 1,
  "stuck_sites": 2,
  "homes_equivalent": 500,
  "homes_vs_seat_households": 0.01,
  "stuck_mw_12m_cut": 1.2,
  "consented_not_built_mw_any_age": 1.2,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 0.8,
  "rank": 391,
  "tech_mix": {
   "solar": 1.2
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Buchanan Gate, Stepps - Solar Panels",
    "address": "6 Buchanan Gate Stepps",
    "repd_ref_id": 14217,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.9,
    "homes_equivalent": 300,
    "consented": "2024-05-17",
    "months_waiting": 26.5,
    "status": "Under Construction"
   },
   {
    "site_name": "Greens Road, Blairlinn - Solar Panels",
    "address": "11 Greens Road, Blairlinn, Cumbernauld, Glasgow",
    "repd_ref_id": 16314,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2024-05-21",
    "months_waiting": 26.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Scottish Water, Buchanan Gate - Hydro Energy Scheme",
    "address": "Scottish Water, The Bridge, 6 Buchanan Gate, Stepps",
    "repd_ref_id": 20546,
    "technology": "Large Hydro",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": null,
    "months_waiting": null,
    "status": "Under Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 40584,
  "seat_total_gbp": 3700000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0,
  "building_mw": 0,
  "approved_mw": 0,
  "approved_24m_mw": 0,
  "refused_mw": 0,
  "submitted_mw": 0,
  "sites": []
 },
 "pipeline_projects": [],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000063",
  "S14000070",
  "S14000086",
  "S14000097",
  "S14000083",
  "S14000105"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}