 "pcon24cd": "S14000062",
 "name": "Aberdeenshire North and Moray East",
 "nation": "Scotland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 120.7,
   "sites": 25
  }
 },
 "number2": {
  "stuck_mw": 214.8,
  "stuck_mw_int": 215,
  "stuck_sites": 17,
  "homes_equivalent": 88000,
  "homes_vs_seat_households": 1.94,
  "stuck_mw_12m_cut": 263.5,
  "consented_not_built_mw_any_age": 263.5,
  "operational_mw": 122.3,
  "operational_homes_equivalent": 106000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 3.7,
  "rank": 18,
  "tech_mix": {
   "solar": 195.8,
   "onshore wind": 19.0
  },
  "tech_summary": "almost all solar",
  "waiting_vs_running": 1.8,
  "projects": [
   {
    "site_name": "Frodo Solar and Battery Energy Development",
    "address": "Frodo Solar Farm, Crimond, Fraserburgh",
    "repd_ref_id": 10993,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 60.1,
    "homes_equivalent": 22000,
    "consented": "2023-05-16",
    "months_waiting": 38.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility",
    "address": "E/O A90 Peterhead to Fraserburgh Road, Se/O St Fergus Village, Peterhead",
    "repd_ref_id": 12822,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 50.0,
    "homes_equivalent": 18000,
    "consented": "2022-12-22",
    "months_waiting": 43.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Bilbo Solar Farm",
    "address": "Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian",
    "repd_ref_id": 6736,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 36.6,
    "homes_equivalent": 13000,
    "consented": "2019-11-15",
    "months_waiting": 80.6,
    "status": "Under Construction"
   },
   {
    "site_name": "Brownside Farm -  Electricity Production Facility & Battery Storage",
    "address": "Brownside Farm, Banff",
    "repd_ref_id": 17759,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 35.0,
    "homes_equivalent": 13000,
    "consented": "2025-06-18",
    "months_waiting": 13.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Denhead - Solar Array",
    "address": "Denhead, Banff",
    "repd_ref_id": 12161,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 25.0,
    "homes_equivalent": 9100,
    "consented": "2024-04-18",
    "months_waiting": 27.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lurg Hill Wind Farm",
    "address": "Lurg Hill, Grange, Deskford, Keith, Grampian",
    "repd_ref_id": 5373,
    "technology": "Wind Onshore",
    "capacity_mw": 15.0,
    "homes_equivalent": 13000,
    "consented": "2019-02-25",
    "months_waiting": 89.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hillhead Of Gask, Longhaven - Solar Array",
    "address": "Hillhead Of Gask Longhaven Peterhead",
    "repd_ref_id": 10469,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 14.2,
    "homes_equivalent": 5200,
    "consented": "2022-04-08",
    "months_waiting": 51.8,
    "status": "Under Construction"
   },
   {
    "site_name": "Greenside Extension - Wind Turbines",
    "address": "Overside & Greenwellheads Farms, Crimond, Fraserburgh, Peterhead",
    "repd_ref_id": 16083,
    "technology": "Wind Onshore",
    "capacity_mw": 7.0,
    "homes_equivalent": 6200,
    "consented": "2025-03-27",
    "months_waiting": 16.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Strichen Solar Project, Clayfords Farm - Solar Panels",
    "address": "Clayfords Farm, W/O Clayfords Cottages, Strichen, Fraserburgh",
    "repd_ref_id": 17030,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 6.0,
    "homes_equivalent": 2200,
    "consented": "2024-11-19",
    "months_waiting": 20.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "St Fergus Renewable Energy Park",
    "address": "Land Adjacent To The St Fergus, St. Fergus, Peterhead",
    "repd_ref_id": 7596,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 5.0,
    "homes_equivalent": 1800,
    "consented": "2021-07-21",
    "months_waiting": 60.4,
    "status": "Under Construction"
   },
   {
    "site_name": "St Fergus Renewable Energy Park",
    "address": "Land Adjacent To The St Fergus, St. Fergus, Peterhead",
    "repd_ref_id": 7595,
    "technology": "Wind Onshore",
    "capacity_mw": 3.0,
    "homes_equivalent": 2600,
    "consented": "2021-07-21",
    "months_waiting": 60.4,
    "status": "Under Construction"
   },
   {
    "site_name": "Bruxiehall Farm",
    "address": "Land To The South Of Bruxiehil, St. Fergus, Peterhead",
    "repd_ref_id": 5845,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.0,
    "homes_equivalent": 700,
    "consented": "2015-11-25",
    "months_waiting": 128.3,
    "status": "Under Construction"
   },
   {
    "site_name": "Wastewater Treatment Works, Fraserburgh",
    "address": "Waste Water Treatment Works At Phingask Fraserburgh",
    "repd_ref_id": 9523,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2020-12-15",
    "months_waiting": 67.6,
    "status": "Under Construction"
   },
   {
    "site_name": "Little Byth Wind Turbines, New Byth - Wind Turbine",
    "address": "Little Byth Wind Turbines New Byth",
    "repd_ref_id": 12504,
    "technology": "Wind Onshore",
    "capacity_mw": 1.0,
    "homes_equivalent": 900,
    "consented": "2023-07-14",
    "months_waiting": 36.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Mcrae Seafoods, Watermill Road -  Solar Array",
    "address": "Mcrae Seafoods, Watermill Road",
    "repd_ref_id": 15200,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.8,
    "homes_equivalent": 300,
    "consented": "2023-12-05",
    "months_waiting": 31.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Jacobshall, Gamrie - Wind Turbine",
    "address": "Jacobshall, Gamrie, Banff",
    "repd_ref_id": 15302,
    "technology": "Wind Onshore",
    "capacity_mw": 0.3,
    "homes_equivalent": 300,
    "consented": "2024-09-02",
    "months_waiting": 23.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lunar Freezing & Cold Storage, Sandhaven Road - Solar panels",
    "address": "Lunar Freezing And Cold Storage Co Ltd Sandhaven Road",
    "repd_ref_id": 11887,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2022-09-26",
    "months_waiting": 46.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Laeso Fish, Damhead Circle - Solar Panels",
    "address": "Laeso Fish Ltd Damhead Circle Dales Industrial Estate",
    "repd_ref_id": 13252,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-04-18",
    "months_waiting": 39.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Mcrae Seafoods - Solar Panels",
    "address": "Mcrae Seafoods, Watermill Road, Fraserburgh",
    "repd_ref_id": 17054,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2024-10-04",
    "months_waiting": 21.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Henderson Road - Solar Panels",
    "address": "Banff And Buchan College Henderson Road Fraserburgh",
    "repd_ref_id": 10627,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-03-29",
    "months_waiting": 52.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "G & J Jack, Harbour Road - Solar Panels",
    "address": "G & J Jack Limited, Harbour Road, Fraserburgh",
    "repd_ref_id": 13923,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-08-31",
    "months_waiting": 35.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hallmoss Workshop, Inverallochy - Solar Panels",
    "address": "Hallmoss Workshop, Inverallochy",
    "repd_ref_id": 9880,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2021-12-23",
    "months_waiting": 55.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Middleton Of Rora - Solar Panels",
    "address": "Middleton Of Rora, Peterhead",
    "repd_ref_id": 18417,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-07-28",
    "months_waiting": 12.2,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 45246,
  "seat_total_gbp": 4200000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 1.0,
  "building_mw": 340.0,
  "approved_mw": 908.6,
  "approved_24m_mw": 364.7,
  "refused_mw": 49.9,
  "submitted_mw": 1449.8,
  "sites": [
   {
    "site_name": "Greystone, Blackhills - Battery Energy Storage System",
    "capacity_mw": 500.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 1752000
   },
   {
    "site_name": "Flushing, Longside - Battery Energy Storage System",
    "capacity_mw": 400.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 1402000
   },
   {
    "site_name": "Netherton, Langside Road - Battery Energy Storage System",
    "capacity_mw": 400.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 1402000
   },
   {
    "site_name": "Gibson Farm, Blackhillock - Battery Energy Storage System",
    "capacity_mw": 349.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 1223000
   },
   {
    "site_name": "Blackhillock Electricity Substation - Battery Energy Storage System",
    "capacity_mw": 300.0,
    "status": "building",
    "year": 2022,
    "homes_while_discharging": 1051000
   },
   {
    "site_name": "Salamander Offshore Wind Farm - Battery Storage and Onshore Connection",
    "capacity_mw": 180.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 631000
   },
   {
    "site_name": "Frodo Solar and Battery Energy Development",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Aultmore Forest - Buckie - Windfarm",
    "capacity_mw": 50.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Electricity Sub Station, Strichen - Battery Storage Facility",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2022,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Smiddyhill, Strichen - Battery Energy Storage",
    "capacity_mw": 49.9,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Drum Farm - Battery Energy Storage System",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2022,
    "homes_while_discharging": 175000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Greystone, Blackhills - Battery Energy Storage System",
   "repd_ref_id": 19212,
   "technology": "Battery",
   "capacity_mw": 500.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006204",
   "operator": "Peterhead Flexpower",
   "address": "The W/O Greystone, Blackhills, Peterhead",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-07-04",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Flushing, Longside - Battery Energy Storage System",
   "repd_ref_id": 18195,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006086",
   "operator": "Harmony Energy Storage",
   "address": "North of Longside Road, Flushing",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-07-04",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Netherton, Langside Road - Battery Energy Storage System",
   "repd_ref_id": 19029,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006137",
   "operator": "Field Energy",
   "address": "Netherton Hub Station, S/O A950 Blackhills, Peterhead",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-08-21",
     "months_waiting": 11
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Gibson Farm, Blackhillock - Battery Energy Storage System",
   "repd_ref_id": 14283,
   "technology": "Battery",
   "capacity_mw": 349.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-12-03",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005237",
   "operator": "Noriker Power Limited",
   "address": "Gibsons Farm, Blackhillock, Keith",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-12-03",
     "years_since_consent": 0.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Blackhillock Electricity Substation - Battery Energy Storage System",
   "repd_ref_id": 9723,
   "technology": "Battery",
   "capacity_mw": 300.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2022-02-28",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003404",
   "operator": "Zenobe Energy Limited",
   "address": "400m SE/O Blackhillock Electricity Substation, Keith",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Salamander Offshore Wind Farm - Battery Storage and Onshore Connection",
   "repd_ref_id": 18567,
   "technology": "Battery",
   "capacity_mw": 180.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-10-28",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005201",
   "operator": "Orsted / Simply Blue Group",
   "address": "Lunderton, N/O Peterhead",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-10-28",
     "years_since_consent": 0.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Aultmore Forest - Buckie - Windfarm",
   "repd_ref_id": 10075,
   "technology": "Wind Onshore",
   "capacity_mw": 105.6,
   "homes_equivalent": 92000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003365",
   "operator": "Vattenfall",
   "address": "Aultmore Forest, Drybridge, Buckie",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 2.4 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-02-28",
     "months_waiting": 29
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Frodo Solar and Battery Energy Development",
   "repd_ref_id": 10993,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 60.1,
   "homes_equivalent": 22000,
   "status": "Awaiting Construction",
   "consented": "2023-05-16",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003345",
   "operator": "Green Energy International",
   "address": "Frodo Solar Farm, Crimond, Fraserburgh",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-05-16",
     "years_since_consent": 3.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage",
   "repd_ref_id": 12303,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-01-30",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2022/1988",
   "operator": "Flexion Energy UK Storage",
   "address": "Adjacent To Greenbank Caravan And Trailers Hillhead Of Phingask",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-01-30",
     "years_since_consent": 3.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility",
   "repd_ref_id": 12822,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2022-12-22",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003226",
   "operator": "Elgin Energy Es Co Limited",
   "address": "E/O A90 Peterhead to Fraserburgh Road, Se/O St Fergus Village, Peterhead",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-12-22",
     "years_since_consent": 3.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Frodo Solar and Battery Energy Development",
   "repd_ref_id": 10994,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-05-16",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003345",
   "operator": "Green Energy International",
   "address": "Frodo Solar Farm, Crimond, Fraserburgh",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-05-16",
     "years_since_consent": 3.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Electricity Sub Station, Strichen - Battery Storage Facility",
   "repd_ref_id": 10039,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-03-01",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2021/2556",
   "operator": "Intelligent Land Investments Group plc",
   "address": "Adj Electricity Sub Station Strichen",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-03-01",
     "years_since_consent": 4.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Aultmore Forest - Buckie - Windfarm",
   "repd_ref_id": 15995,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003365",
   "operator": "Vattenfall",
   "address": "Aultmore Forest, Drybridge, Buckie",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 2.4 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-02-28",
     "months_waiting": 29
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Electricity Substation, Westerton Road - Battery Storage",
   "repd_ref_id": 12467,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-03-15",
   "refused": null,
   "planning_authority": "Moray",
   "planning_ref": "22/01488/APP",
   "operator": "Keith Renewables Limited",
   "address": "Adjacent To Electricity Substation Westerton Road",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-03-15",
     "years_since_consent": 3.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Boothby Road - Battery Storage",
   "repd_ref_id": 19944,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2025/0765",
   "operator": "Opdenergy UK Limted",
   "address": "West Side Of Boothby Road, Fraserburgh",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "Aberdeenshire Council",
    "evidence": {
     "submitted": "2025-05-23",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue",
     "gate2",
     "connection_date"
    ]
   },
   "earliest": "2033",
   "tec": {
    "project": "Boothby Road BESS (PI CS)",
    "connection_date": "2033-10-31",
    "connection_year": 2033,
    "mw": 50.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Whitestones Birks Farm, Longmanhill - BESS",
   "repd_ref_id": 18416,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-11-07",
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2025/0871",
   "operator": "OPDE UK Limted",
   "address": "S/O Whitestones, Birks Farm, Longmanhill, Banff",
   "reason": {
    "reason": "refused",
    "label": "Refused by Aberdeenshire Council in 2025",
    "who": "Aberdeenshire Council",
    "evidence": {
     "refusal_date": "2025-11-07"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Smiddyhill, Strichen - Battery Energy Storage",
   "repd_ref_id": 16884,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2024/1770",
   "operator": "Muirden Energy",
   "address": "North Of Smiddyhill Strichen",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 21 months for a planning decision",
    "who": "Aberdeenshire Council",
    "evidence": {
     "submitted": "2024-10-31",
     "months_waiting": 21
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Law Of Doune Road, Macduff - Battery Storage",
   "repd_ref_id": 10894,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-12-05",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2023/0130",
   "operator": "Intelligent Land Investments Group Plc",
   "address": "South Of Macduff Electricity Substation Law Of Doune Road Macduff",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-12-05",
     "years_since_consent": 2.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Drum Farm - Battery Energy Storage System",
   "repd_ref_id": 9940,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-10-27",
   "refused": null,
   "planning_authority": "Moray",
   "planning_ref": "22/00715/APP",
   "operator": "Field Energy",
   "address": "Drum Farm, Keith",
   "reason": {
    "reason": "gate2",
    "label": "Still in the grid queue review \u2014 no firm connection date yet",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "The Drum Wind Farm",
     "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2037",
   "tec": {
    "project": "The Drum Wind Farm",
    "connection_date": "2037-10-31",
    "connection_year": 2037,
    "mw": 57.6,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "A981 Fraserburgh - Battery Energy Storage",
   "repd_ref_id": 12711,
   "technology": "Battery",
   "capacity_mw": 45.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-04-13",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2023/0193",
   "operator": "Fraserburgh Energy Limited",
   "address": "East Of A981",
   "reason": {
    "reason": "gate2",
    "label": "Cleared the grid queue review, so it now has a firm connection date",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Fraserburgh Energy Storage",
     "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2027",
   "tec": {
    "project": "Fraserburgh Energy Storage",
    "connection_date": "2027-10-31",
    "connection_year": 2027,
    "mw": 40.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Bilbo Solar Farm Energy Storage",
   "repd_ref_id": 7020,
   "technology": "Battery",
   "capacity_mw": 40.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2019-10-18",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2019/0296",
   "operator": "Green Energy International",
   "address": "Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian",
   "reason": {
    "reason": "gate2",
    "label": "Cleared the grid queue review, so it now has a firm connection date",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Bilbo Farm",
     "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "building"
    ]
   },
   "earliest": "2024",
   "tec": {
    "project": "Bilbo Farm",
    "connection_date": "2024-10-31",
    "connection_year": 2024,
    "mw": 67.1,
    "stage": 1.0,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Bilbo Solar Farm",
   "repd_ref_id": 6736,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 36.6,
   "homes_equivalent": 13000,
   "status": "Under Construction",
   "consented": "2019-11-15",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2019/0296",
   "operator": "Green Energy International",
   "address": "Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Brownside Farm -  Electricity Production Facility & Battery Storage",
   "repd_ref_id": 17759,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 35.0,
   "homes_equivalent": 13000,
   "status": "Awaiting Construction",
   "consented": "2025-06-18",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "ENQ/2024/1328",
   "operator": "Aberdeenshire Council",
   "address": "Brownside Farm, Banff",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-06-18",
     "years_since_consent": 1.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Denhead - Solar Array",
   "repd_ref_id": 12161,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 25.0,
   "homes_equivalent": 9100,
   "status": "Awaiting Construction",
   "consented": "2024-04-18",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2023/2040",
   "operator": "Muirden Energy",
   "address": "Denhead, Banff",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-04-18",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility",
   "repd_ref_id": 12823,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-12-22",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003226",
   "operator": "Elgin Energy Es Co Limited",
   "address": "E/O A90 Peterhead to Fraserburgh Road, Se/O St Fergus Village, Peterhead",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-12-22",
     "years_since_consent": 3.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Lurg Hill Wind Farm",
   "repd_ref_id": 5373,
   "technology": "Wind Onshore",
   "capacity_mw": 15.0,
   "homes_equivalent": 13000,
   "status": "Awaiting Construction",
   "consented": "2019-02-25",
   "refused": "2018-06-20",
   "planning_authority": "Moray",
   "planning_ref": "17/01198/EIA",
   "operator": "Vento Ludens",
   "address": "Lurg Hill, Grange, Deskford, Keith, Grampian",
   "reason": {
    "reason": "connection_date",
    "label": "Its grid connection date of 2024 has passed and it is still not generating",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Lurg Hill",
     "connection_date": "2024-05-01",
     "mw": 15.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2024",
   "tec": {
    "project": "Lurg Hill",
    "connection_date": "2024-05-01",
    "connection_year": 2024,
    "mw": 15.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Brownside Farm -  Electricity Production Facility & Battery Storage",
   "repd_ref_id": 17760,
   "technology": "Battery",
   "capacity_mw": 14.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-06-18",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "ENQ/2024/1328",
   "operator": "Aberdeenshire Council",
   "address": "Brownside Farm, Banff",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-06-18",
     "years_since_consent": 1.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hillhead Of Gask, Longhaven - Solar Array",
   "repd_ref_id": 10469,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 14.2,
   "homes_equivalent": 5200,
   "status": "Under Construction",
   "consented": "2022-04-08",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2021/2467",
   "operator": "The Greenspan Agency",
   "address": "Hillhead Of Gask Longhaven Peterhead",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Greenside Extension - Wind Turbines",
   "repd_ref_id": 16083,
   "technology": "Wind Onshore",
   "capacity_mw": 7.0,
   "homes_equivalent": 6200,
   "status": "Awaiting Construction",
   "consented": "2025-03-27",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2024/0229",
   "operator": "Greenside Wind Energy Limited",
   "address": "Overside & Greenwellheads Farms, Crimond, Fraserburgh, Peterhead",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-03-27",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Strichen Solar Project, Clayfords Farm - Solar Panels",
   "repd_ref_id": 17030,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 6.0,
   "homes_equivalent": 2200,
   "status": "Awaiting Construction",
   "consented": "2024-11-19",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2024/1169",
   "operator": "Solar Farm Number 2",
   "address": "Clayfords Farm, W/O Clayfords Cottages, Strichen, Fraserburgh",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-11-19",
     "years_since_consent": 1.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "St Fergus Renewable Energy Park",
   "repd_ref_id": 7596,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 5.0,
   "homes_equivalent": 1800,
   "status": "Under Construction",
   "consented": "2021-07-21",
   "refused": "2020-12-07",
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2019/2653",
   "operator": "Ednie Farms",
   "address": "Land Adjacent To The St Fergus, St. Fergus, Peterhead",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility",
   "repd_ref_id": 14108,
   "technology": "Anaerobic Digestion",
   "capacity_mw": 4.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-03-13",
   "refused": null,
   "planning_authority": "Moray",
   "planning_ref": "23/00892/APP",
   "operator": "Grissan Engineering Services Limited",
   "address": "200 Metres To The W/O The Portgordon Maltings, Buckie",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-03-13",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "The Portgordon Maltings, Phase 3 - Aerobic Digestion Facility",
   "repd_ref_id": 14137,
   "technology": "Anaerobic Digestion",
   "capacity_mw": 4.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-03-13",
   "refused": null,
   "planning_authority": "Moray",
   "planning_ref": "23/00895/APP",
   "operator": "Grissan Engineering Services Limited",
   "address": "250 Metres To The W/O Portgordon Maltings, Buckie",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-03-13",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "The Portgordon Maltings, Phase 2 - Aerobic Digestion Facility",
   "repd_ref_id": 14109,
   "technology": "Anaerobic Digestion",
   "capacity_mw": 4.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-03-13",
   "refused": null,
   "planning_authority": "Moray",
   "planning_ref": "23/00894/APP",
   "operator": "Grisasan Engineering Services Limited",
   "address": "150 Metres To The W/O The Portgordon, Maltings, Buckie",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-03-13",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "St Fergus Renewable Energy Park",
   "repd_ref_id": 7595,
   "technology": "Wind Onshore",
   "capacity_mw": 3.0,
   "homes_equivalent": 2600,
   "status": "Under Construction",
   "consented": "2021-07-21",
   "refused": "2020-12-07",
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2019/2653",
   "operator": "Ednie Farms",
   "address": "Land Adjacent To The St Fergus, St. Fergus, Peterhead",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Bruxiehall Farm",
   "repd_ref_id": 5845,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.0,
   "homes_equivalent": 700,
   "status": "Under Construction",
   "consented": "2015-11-25",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2015/3060",
   "operator": "Bruxiehill Wind Energy",
   "address": "Land To The South Of Bruxiehil, St. Fergus, Peterhead",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Wastewater Treatment Works, Fraserburgh",
   "repd_ref_id": 9523,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.0,
   "homes_equivalent": 400,
   "status": "Under Construction",
   "consented": "2020-12-15",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2020/1636",
   "operator": "Scottish Water",
   "address": "Waste Water Treatment Works At Phingask Fraserburgh",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Little Byth Wind Turbines, New Byth - Wind Turbine",
   "repd_ref_id": 12504,
   "technology": "Wind Onshore",
   "capacity_mw": 1.0,
   "homes_equivalent": 900,
   "status": "Awaiting Construction",
   "consented": "2023-07-14",
   "refused": null,
   "planning_authority": "Aberdeenshire",
   "planning_ref": "APP/2022/2255",
   "operator": "4L Energy Limited",
   "address": "Little Byth Wind Turbines New Byth",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-07-14",
     "years_since_consent": 3.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000098",
  "S14000091"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}