 "pcon24cd": "E14001598",
 "name": "Worsley and Eccles",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 0.4,
  "stuck_mw_int": 0,
  "stuck_sites": 2,
  "homes_equivalent": 200,
  "homes_vs_seat_households": 0.0,
  "stuck_mw_12m_cut": 0.8,
  "consented_not_built_mw_any_age": 1.0,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.8,
  "rank": 500,
  "tech_mix": {
   "solar": 0.4
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Ferrous Way - Solar PV Array",
    "address": "1 Ferrous Way",
    "repd_ref_id": 18006,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2025-03-19",
    "months_waiting": 16.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Ferrous Way - Solar Panels",
    "address": "2 Ferrous Way Irlam",
    "repd_ref_id": 12892,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-01-16",
    "months_waiting": 42.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Barton Business Park, Cawdor Street - Solar Panels",
    "address": "Barton Business Park, Cawdor Street",
    "repd_ref_id": 20550,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2026-05-01",
    "months_waiting": 3.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "CSG Cadishead Weee, Liverpool Road - Solar Panels",
    "address": "Csg Cadishead, Weee And Pits Building, Liverpool Road, Caddishead, Irlam",
    "repd_ref_id": 15118,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-11-22",
    "months_waiting": 32.4,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 46032,
  "seat_total_gbp": 4200000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": []
 },
 "pipeline_projects": [
  {
   "site_name": "Whitehead Landfill Site, Lower Green Lane - Solar Farm",
   "repd_ref_id": 17060,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 10.0,
   "homes_equivalent": 3600,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Wigan",
   "planning_ref": "PA/2024/0759",
   "operator": "Whitehead Restoration Limited",
   "address": "Whitehead Landfill Site, Lower Green Lane, Astley, Manchester",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 23 months for a planning decision",
    "who": "Wigan Council",
    "evidence": {
     "submitted": "2024-09-05",
     "months_waiting": 23
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001564",
  "E14001528",
  "E14001329",
  "E14001459",
  "E14001111"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}