 "pcon24cd": "E14001551",
 "name": "Torbay",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 3.7,
  "stuck_mw_int": 4,
  "stuck_sites": 3,
  "homes_equivalent": 1300,
  "homes_vs_seat_households": 0.03,
  "stuck_mw_12m_cut": 3.7,
  "consented_not_built_mw_any_age": 3.7,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.6,
  "rank": 284,
  "tech_mix": {
   "solar": 3.7
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Torbay Hospital, Nightingale Park - Solar Panel Array",
    "address": "Nightingale Park Barton Hill Way Torquay",
    "repd_ref_id": 10367,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 3.2,
    "homes_equivalent": 1200,
    "consented": "2022-06-16",
    "months_waiting": 49.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Morrisons, Totnes Road - Solar Panels",
    "address": "Morrisons, Totnes Road, Paignton",
    "repd_ref_id": 12417,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2022-11-22",
    "months_waiting": 44.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Torbay Leisure Centre - Energy Project",
    "address": "Torbay Leisure Centre Penwill Way Paignton",
    "repd_ref_id": 10654,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-03-11",
    "months_waiting": 52.8,
    "status": "Under Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 47481,
  "seat_total_gbp": 4400000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 22.5,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Barton Hill Industrial Park - Battery Energy Storage Facility",
    "capacity_mw": 22.5,
    "status": "operating",
    "year": 2021,
    "homes_while_discharging": 79000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Torbay Hospital, Nightingale Park - Solar Panel Array",
   "repd_ref_id": 10367,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 3.2,
   "homes_equivalent": 1200,
   "status": "Awaiting Construction",
   "consented": "2022-06-16",
   "refused": null,
   "planning_authority": "Torbay",
   "planning_ref": "P/2021/1287",
   "operator": "TDA",
   "address": "Nightingale Park Barton Hill Way Torquay",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-06-16",
     "years_since_consent": 4.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001484",
  "E14001381"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}