 "pcon24cd": "E14001430",
 "name": "Poplar and Limehouse",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 0.2,
  "stuck_mw_int": 0,
  "stuck_sites": 1,
  "homes_equivalent": 100,
  "homes_vs_seat_households": 0.0,
  "stuck_mw_12m_cut": 0.5,
  "consented_not_built_mw_any_age": 0.5,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 11.1,
  "rank": 550,
  "tech_mix": {
   "solar": 0.2
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "John Orwell Sports Centre, Tench Street - Solar Panels",
    "address": "John Orwell Sports Centre, Tench Street, Tower Hamlets",
    "repd_ref_id": 18540,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2025-04-23",
    "months_waiting": 15.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Highway - 114 Flats, Office Accomodation & Self Storage Facility",
    "address": "60-70 & 100, The Highway, 110 Pennington Street, Tower Hamlets",
    "repd_ref_id": 11921,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-08-24",
    "months_waiting": 35.3,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 56173,
  "seat_total_gbp": 5200000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0,
  "building_mw": 0,
  "approved_mw": 0,
  "approved_24m_mw": 0,
  "refused_mw": 0,
  "submitted_mw": 0,
  "sites": []
 },
 "pipeline_projects": [
  {
   "site_name": "Hedgehog Grove Solar Farm - Solar Panels",
   "repd_ref_id": 18870,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 98.0,
   "homes_equivalent": 36000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "26/00440/FUL",
   "operator": "Totalenergies Renewables Uk Limited (Hedgehog Grove Solar Farm)",
   "address": "Hedgehog Grove Solar Farm, S/O The A120 Between Bannister Green And Bartholomew Green",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "the Planning Inspectorate (it decides nationally significant projects)",
    "evidence": {
     "submitted": "2026-03-24",
     "months_waiting": 4
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001172",
  "E14001576",
  "E14001086",
  "E14001525"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}