 "pcon24cd": "E14001253",
 "name": "Grantham and Bourne",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 151.3,
  "stuck_mw_int": 151,
  "stuck_sites": 10,
  "homes_equivalent": 55000,
  "homes_vs_seat_households": 1.27,
  "stuck_mw_12m_cut": 791.7,
  "consented_not_built_mw_any_age": 842.1,
  "operational_mw": 119.5,
  "operational_homes_equivalent": 43000,
  "refused_5y_mw": 38.8,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 3.1,
  "rank": 32,
  "tech_mix": {
   "solar": 151.3
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 1.3,
  "projects": [
   {
    "site_name": "Heckington Fen Solar Park",
    "address": "Six Hundreds Farmhouse, Six Hundreds Drove East, Heckington, Sleaford, Boston",
    "repd_ref_id": 9806,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 500.0,
    "homes_equivalent": 182000,
    "consented": "2025-01-24",
    "months_waiting": 18.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Little Hale Fen - Solar Farm",
    "address": "Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln",
    "repd_ref_id": 9586,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 50.0,
    "homes_equivalent": 18000,
    "consented": "2025-08-13",
    "months_waiting": 11.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Bypass Solar Farm",
    "address": "S/O The A1, Foston By-Pass, Foston, Grantham",
    "repd_ref_id": 9050,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 50.0,
    "homes_equivalent": 18000,
    "consented": "2021-03-01",
    "months_waiting": 65.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Ash Tree Solar Farm & Battery Storage",
    "address": "High Dike Road Londonthorpe",
    "repd_ref_id": 15396,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2025-07-18",
    "months_waiting": 12.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Welby Solar Farm, Welby - Solar Farm",
    "address": "Welby Solar Farm, N/O Welby, Grantham",
    "repd_ref_id": 15193,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 46.0,
    "homes_equivalent": 17000,
    "consented": "2025-02-10",
    "months_waiting": 17.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Washdyke Farm, Billingborough Road - Solar farm",
    "address": "Washdyke Farm, Billingborough Road, Folkingham, Sleaford",
    "repd_ref_id": 12419,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 27.0,
    "homes_equivalent": 9800,
    "consented": "2024-04-23",
    "months_waiting": 27.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "White Cross Lane",
    "address": "Land To The North Of, White Cross Lane, Burton Gorse, Sleaford",
    "repd_ref_id": 6530,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 25.0,
    "homes_equivalent": 9100,
    "consented": "2019-12-31",
    "months_waiting": 79.1,
    "status": "Under Construction"
   },
   {
    "site_name": "Side Barn, Church Lane - Solar Farm",
    "address": "Side Barn Church Lane",
    "repd_ref_id": 13592,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 24.0,
    "homes_equivalent": 8700,
    "consented": "2025-01-15",
    "months_waiting": 18.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Green Lane & Cliff Lane, Gonerby Moor - Solar Farm",
    "address": "South Of Green Lane And West Of Cliff Lane, Gonerby Moor",
    "repd_ref_id": 19165,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 23.0,
    "homes_equivalent": 8300,
    "consented": "2024-01-22",
    "months_waiting": 30.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Gorse Lane",
    "address": "Land South Of, Gorse Lane, Silk Willoughby, Sleaford",
    "repd_ref_id": 6701,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 20.0,
    "homes_equivalent": 7300,
    "consented": "2019-03-29",
    "months_waiting": 88.2,
    "status": "Under Construction"
   },
   {
    "site_name": "Limes Farm Solar Farm & Battery Energy Storage",
    "address": "Limes Solar Farm On Lands Circa 0.5km North Of Limes Farm Bourne",
    "repd_ref_id": 11796,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 20.0,
    "homes_equivalent": 7300,
    "consented": "2025-05-12",
    "months_waiting": 14.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "New Earth Solutions West, High Dike - Solar Panels & Battery Srorage",
    "address": "New Earth Solutions (West) Ltd, Copper Hill Industrial Estate, High Dike, Wilsford",
    "repd_ref_id": 12732,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 4.8,
    "homes_equivalent": 1700,
    "consented": "2023-01-31",
    "months_waiting": 42.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Mid UK Recycling, Caythorpe Heath Lane -  Solar Photovoltaic Panels",
    "address": "Mid Uk Recycling Limited, Caythorpe Heath Lane, Caythorpe, Grantham",
    "repd_ref_id": 12585,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2022-12-14",
    "months_waiting": 43.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "MV Fruehauf Limited, Houghton Road - Solar Panels",
    "address": "Invicta Works, Houghton Road, Grantham",
    "repd_ref_id": 18462,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2025-05-02",
    "months_waiting": 15.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hangar, Roseland Business Park - Solar panels",
    "address": "Hangar 7-7a Roseland Business Park Long Bennington",
    "repd_ref_id": 20636,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2026-04-28",
    "months_waiting": 3.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Walton Girls School, Kitty Briggs Lane - Solar Panels",
    "address": "Walton Girls School, Kitty Briggs Lane, Grantham",
    "repd_ref_id": 19359,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-09-19",
    "months_waiting": 10.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "BGB Engineering Limited - Solar Panels Scheme",
    "address": "357 Dysart Road, Grantham",
    "repd_ref_id": 11489,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-07-20",
    "months_waiting": 48.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Belton Garden Centre, Grantham Road - Solar Arrays",
    "address": "Belton Garden Centre Grantham Road Belton",
    "repd_ref_id": 13631,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-06-07",
    "months_waiting": 37.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kellington House, South Fen Road - Solar Panels",
    "address": "Kellington House South Fen Road",
    "repd_ref_id": 13196,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2023-03-22",
    "months_waiting": 40.4,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 43089,
  "seat_total_gbp": 4000000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 174.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 1000.0,
  "sites": [
   {
    "site_name": "Canners Lane Energy Park, High Dike - Battery Energy Storage",
    "capacity_mw": 1000.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 3504000
   },
   {
    "site_name": "Little Hale Drove, Little Hale Fen - Battery Storage",
    "capacity_mw": 99.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 347000
   },
   {
    "site_name": "Little Hale Fen - Solar Farm",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Ash Tree Solar Farm & Battery Storage",
    "capacity_mw": 25.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 88000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Canners Lane Energy Park, High Dike - Battery Energy Storage",
   "repd_ref_id": 18652,
   "technology": "Battery",
   "capacity_mw": 1000.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "S25/1534",
   "operator": "NatPower UK",
   "address": "East High Dike, Grantham",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "North Kesteven Council",
    "evidence": {
     "submitted": "2025-09-23",
     "months_waiting": 10
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Heckington Fen Solar Park",
   "repd_ref_id": 9806,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 500.0,
   "homes_equivalent": 182000,
   "status": "Awaiting Construction",
   "consented": "2025-01-24",
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010123",
   "operator": "Ecotricity Limited",
   "address": "Six Hundreds Farmhouse, Six Hundreds Drove East, Heckington, Sleaford, Boston",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2028, 3 years after it was approved",
    "who": "the grid operator (NESO) and National Grid",
    "evidence": {
     "project": "Heckington Fen Solar Park",
     "connection_date": "2028-10-01",
     "mw": 400.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Heckington Fen Solar Park",
    "connection_date": "2028-10-01",
    "connection_year": 2028,
    "mw": 400.0,
    "stage": null,
    "who": "the grid operator (NESO) and National Grid",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Little Hale Drove, Little Hale Fen - Battery Storage",
   "repd_ref_id": 17585,
   "technology": "Battery",
   "capacity_mw": 99.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-03-14",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "24/1265/FUL",
   "operator": "Root-Power (South) Limited",
   "address": "Lying To The South Of Little Hale Drove Little Hale Fen",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-03-14",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Little Hale Fen - Solar Farm",
   "repd_ref_id": 14955,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-08-13",
   "refused": "2024-11-07",
   "planning_authority": "North Kesteven",
   "planning_ref": "23/1021/FUL",
   "operator": "AGR Solar 2 Limited",
   "address": "Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-13",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Little Hale Fen - Solar Farm",
   "repd_ref_id": 9586,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2025-08-13",
   "refused": "2024-11-07",
   "planning_authority": "North Kesteven",
   "planning_ref": "23/1021/FUL",
   "operator": "AGR Solar 2 Limited",
   "address": "Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-13",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Bypass Solar Farm",
   "repd_ref_id": 9050,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2021-03-01",
   "refused": null,
   "planning_authority": "South Kesteven",
   "planning_ref": "S20/1433",
   "operator": "By-Pass Farm Solar Limited",
   "address": "S/O The A1, Foston By-Pass, Foston, Grantham",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-03-01",
     "years_since_consent": 5.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Ash Tree Solar Farm & Battery Storage",
   "repd_ref_id": 15396,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2025-07-18",
   "refused": "2024-10-25",
   "planning_authority": "South Kesteven",
   "planning_ref": "S23/2199",
   "operator": "Low Carbon Limited",
   "address": "High Dike Road Londonthorpe",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-18",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Welby Solar Farm, Welby - Solar Farm",
   "repd_ref_id": 15193,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 46.0,
   "homes_equivalent": 17000,
   "status": "Awaiting Construction",
   "consented": "2025-02-10",
   "refused": null,
   "planning_authority": "South Kesteven",
   "planning_ref": "S24/1040",
   "operator": "Island Green Power",
   "address": "Welby Solar Farm, N/O Welby, Grantham",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-10",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Burton Gorse Plantation, Whitecross Lane - Solar Panels",
   "repd_ref_id": 17363,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 42.0,
   "homes_equivalent": 15000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "24/1470/FUL",
   "operator": "Starlight Energy",
   "address": "Adj Burton Gorse Plantation, N/O Whitecross Lane, Burton Pedwardine, Sleaford",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 16 months for a planning decision",
    "who": "North Kesteven Council",
    "evidence": {
     "submitted": "2025-03-26",
     "months_waiting": 16
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Glebe Farm Solar Farm",
   "repd_ref_id": 19213,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 38.8,
   "homes_equivalent": 14000,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-10-14",
   "planning_authority": "South Kesteven",
   "planning_ref": "S25/1194",
   "operator": "Stark Energy Limited",
   "address": "N/O Glebe Farm, Welby Road, Ropsley, Grantham",
   "reason": {
    "reason": "refused",
    "label": "Refused by South Kesteven Council in 2025",
    "who": "South Kesteven Council",
    "evidence": {
     "refusal_date": "2025-10-14"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Washdyke Farm, Billingborough Road - Solar farm",
   "repd_ref_id": 12419,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 27.0,
   "homes_equivalent": 9800,
   "status": "Awaiting Construction",
   "consented": "2024-04-23",
   "refused": "2024-04-23",
   "planning_authority": "South Kesteven",
   "planning_ref": "S23/0511",
   "operator": "GS Ignis Limited",
   "address": "Washdyke Farm, Billingborough Road, Folkingham, Sleaford",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-04-23",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "White Cross Lane",
   "repd_ref_id": 6530,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 25.0,
   "homes_equivalent": 9100,
   "status": "Under Construction",
   "consented": "2019-12-31",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "19/0863/FUL",
   "operator": "Nextpower SPV 5 Limited",
   "address": "Land To The North Of, White Cross Lane, Burton Gorse, Sleaford",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Ash Tree Solar Farm & Battery Storage",
   "repd_ref_id": 15397,
   "technology": "Battery",
   "capacity_mw": 25.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-18",
   "refused": "2024-10-25",
   "planning_authority": "South Kesteven",
   "planning_ref": "S23/2199",
   "operator": "Low Carbon Limited",
   "address": "High Dike Road Londonthorpe",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-18",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Side Barn, Church Lane - Solar Farm",
   "repd_ref_id": 13592,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 24.0,
   "homes_equivalent": 8700,
   "status": "Awaiting Construction",
   "consented": "2025-01-15",
   "refused": "2024-07-25",
   "planning_authority": "South Kesteven",
   "planning_ref": "S24/0360",
   "operator": "PS Renewables Limited",
   "address": "Side Barn Church Lane",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-01-15",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Green Lane & Cliff Lane, Gonerby Moor - Solar Farm",
   "repd_ref_id": 19165,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 23.0,
   "homes_equivalent": 8300,
   "status": "Awaiting Construction",
   "consented": "2024-01-22",
   "refused": null,
   "planning_authority": "South Kesteven",
   "planning_ref": "S23/1934",
   "operator": "Lightsource BP",
   "address": "South Of Green Lane And West Of Cliff Lane, Gonerby Moor",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-01-22",
     "years_since_consent": 2.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Gorse Lane",
   "repd_ref_id": 6701,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Under Construction",
   "consented": "2019-03-29",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "19/0060/FUL",
   "operator": "Elgin Energy Esco",
   "address": "Land South Of, Gorse Lane, Silk Willoughby, Sleaford",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Limes Farm Solar Farm & Battery Energy Storage",
   "repd_ref_id": 11796,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Awaiting Construction",
   "consented": "2025-05-12",
   "refused": null,
   "planning_authority": "South Kesteven",
   "planning_ref": "S24/2191",
   "operator": "Downing Limited Liability Partnership",
   "address": "Limes Solar Farm On Lands Circa 0.5km North Of Limes Farm Bourne",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-05-12",
     "years_since_consent": 1.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "New Earth Solutions West, High Dike - Solar Panels & Battery Srorage",
   "repd_ref_id": 12732,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 4.8,
   "homes_equivalent": 1700,
   "status": "Awaiting Construction",
   "consented": "2023-01-31",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "PL/0123/22",
   "operator": "New Earth Solutions (West) Limited",
   "address": "New Earth Solutions (West) Ltd, Copper Hill Industrial Estate, High Dike, Wilsford",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-01-31",
     "years_since_consent": 3.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001487",
  "E14001458",
  "E14001476",
  "E14001114",
  "E14001357",
  "E14001375"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}