{
 "pcon24cd": "E14001224",
 "name": "Ely and East Cambridgeshire",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 145.3,
  "stuck_mw_int": 145,
  "stuck_sites": 10,
  "homes_equivalent": 53000,
  "homes_vs_seat_households": 1.18,
  "stuck_mw_12m_cut": 145.3,
  "consented_not_built_mw_any_age": 195.7,
  "operational_mw": 257.1,
  "operational_homes_equivalent": 93000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.7,
  "median_months_to_decision": 2.0,
  "rank": 36,
  "tech_mix": {
   "solar": 145.3
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.6,
  "projects": [
   {
    "site_name": "Burwell Anchor Lane Farm, Newnham Drove - Solar Panels",
    "address": "Anchor Lane Farm, Newnham Drove, Burwell, Cambridge",
    "repd_ref_id": 17757,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 50.0,
    "homes_equivalent": 18000,
    "consented": "2026-03-20",
    "months_waiting": 4.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Burwell Solar Farm",
    "address": "Site Noth Of Hightown Drove, Burwell, Cambridge",
    "repd_ref_id": 7630,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2020-11-19",
    "months_waiting": 68.4,
    "status": "Under Construction"
   },
   {
    "site_name": "Newmarket Road, Bottisham - Solar Array",
    "address": "Six Oaks Renewable Energy Park Newmarket Road Bottisham",
    "repd_ref_id": 10485,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2023-12-21",
    "months_waiting": 31.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "North Angle Farm",
    "address": "Soham, Cambridge, Cambridgeshire",
    "repd_ref_id": 7482,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 29.4,
    "homes_equivalent": 11000,
    "consented": "2020-11-25",
    "months_waiting": 68.2,
    "status": "Under Construction"
   },
   {
    "site_name": "Chittering Solar Farm - extension 2",
    "address": "Land east and south of Radical Farm, Chittering Drove, Chittering, Cambridgeshire, CB25 9PH",
    "repd_ref_id": 1939,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 9.6,
    "homes_equivalent": 3500,
    "consented": "2015-06-16",
    "months_waiting": 133.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Goose Hall Solar Farm",
    "address": "Goose Hall Farm Factory Road, Burwell Cambridge",
    "repd_ref_id": 9528,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 5.0,
    "homes_equivalent": 1800,
    "consented": "2021-03-19",
    "months_waiting": 64.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Harbour School, Station Road - Solar Panels & ASHP",
    "address": "The Harbour School Station Road Wilburton",
    "repd_ref_id": 12221,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.9,
    "homes_equivalent": 300,
    "consented": "2022-11-04",
    "months_waiting": 44.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lees Packhouse, The Gault - Solar PV System",
    "address": "Lees Packhouse, The Gault, Sutton",
    "repd_ref_id": 13779,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-06-06",
    "months_waiting": 37.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Quotient Bioresearch Limited, Newmarket Road - Solar Panels",
    "address": "Quotient Bioresearch Limited, Newmarket Road, Fordham, Ely",
    "repd_ref_id": 19687,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-11-06",
    "months_waiting": 8.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cambridge Commodities, Lancaster Way Business Park - Solar Panels",
    "address": "Cambridge Commodities Ltd. 203 Lancaster Way Business Park",
    "repd_ref_id": 15364,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-01-15",
    "months_waiting": 30.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Mettleham Farm Centre, Hasse Road - Solar Panels",
    "address": "Mettleham Farm Centre Hasse Road Soham",
    "repd_ref_id": 13287,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2023-03-27",
    "months_waiting": 40.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Willow Hall Farm, Hillrow Causeway - Solar Panels",
    "address": "Willow Hall Farm, Hillrow Causeway, Haddenham, Ely",
    "repd_ref_id": 19240,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2025-08-08",
    "months_waiting": 11.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cambridge Waste Management Park - Solar Farm",
    "address": "Cambridge Waste Management Park, Ely Road, Landbeach, Cambridge",
    "repd_ref_id": 10589,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-11-17",
    "months_waiting": 8.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Cloisters - Solar Panels",
    "address": "Units 5-11 And 8-12, The Cloisters, Ely",
    "repd_ref_id": 13893,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2023-06-28",
    "months_waiting": 37.2,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 44828,
  "seat_total_gbp": 4100000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 50.7,
  "building_mw": 0.0,
  "approved_mw": 550.1,
  "approved_24m_mw": 99.9,
  "refused_mw": 90.0,
  "submitted_mw": 30.0,
  "sites": [
   {
    "site_name": "Wicken Bridleway, Church Road - Battery Energy Storage",
    "capacity_mw": 400.0,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 1402000
   },
   {
    "site_name": "Land Southwest of Hightown Drove, Burwell - Battery Energy Storage System",
    "capacity_mw": 90.0,
    "status": "refused",
    "year": 2026,
    "homes_while_discharging": 315000
   },
   {
    "site_name": "Burwell - Battery Storage",
    "capacity_mw": 50.0,
    "status": "operating",
    "year": 2018,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Newmarket Road, Bottisham -  Battery Energy Storage",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Anchor Lane, Burwell - Battery Energy Storage",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Reach Road",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2020,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Weirs Drove, Burwell - Battery Storage Facility",
    "capacity_mw": 30.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 105000
   },
   {
    "site_name": "Breach Farm - Solar farm",
    "capacity_mw": 0.7,
    "status": "operating",
    "year": 2021,
    "homes_while_discharging": 2300
   },
   {
    "site_name": "Sewage Pumping Station - Micro Energy Storage",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 700
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Wicken Bridleway, Church Road - Battery Energy Storage",
   "repd_ref_id": 16410,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2026-04-08",
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "25/00303/FUM",
   "operator": "Green Switch Capital Limited",
   "address": "Field Btw Wicken Bridleway 38 And Soham Bridleway, 126 Church Road, Wicken, Ely",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-04-08",
     "years_since_consent": 0.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Land Southwest of Hightown Drove, Burwell - Battery Energy Storage System",
   "repd_ref_id": 17433,
   "technology": "Battery",
   "capacity_mw": 90.0,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2026-03-09",
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "25/00639/FUM",
   "operator": "Grenergy Renewables UK Limited",
   "address": "Sw/O Hightown Drove, Burwell, Cambridge",
   "reason": {
    "reason": "refused",
    "label": "Refused by East Cambridgeshire Council in 2026",
    "who": "East Cambridgeshire Council",
    "evidence": {
     "refusal_date": "2026-03-09"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Newmarket Road, Bottisham -  Battery Energy Storage",
   "repd_ref_id": 10486,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-12-21",
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "22/01291/ESF",
   "operator": "Ridge Clean Energy Limited",
   "address": "Six Oaks Renewable Energy Park Newmarket Road Bottisham",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-12-21",
     "years_since_consent": 2.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Anchor Lane, Burwell - Battery Energy Storage",
   "repd_ref_id": 16094,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-05-20",
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "24/00160/ESF",
   "operator": "Burwell AL Limited",
   "address": "Anchor Lane, Newnham Drove, Burwell, Cambridge",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-05-20",
     "years_since_consent": 1.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Burwell Anchor Lane Farm, Newnham Drove - Solar Panels",
   "repd_ref_id": 17757,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2026-03-20",
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "25/00393/FUM",
   "operator": "Burwell AL Limited",
   "address": "Anchor Lane Farm, Newnham Drove, Burwell, Cambridge",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-03-20",
     "years_since_consent": 0.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Burwell Solar Farm",
   "repd_ref_id": 7630,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Under Construction",
   "consented": "2020-11-19",
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "20/00557/ESF",
   "operator": "EDF Energy Renewables",
   "address": "Site Noth Of Hightown Drove, Burwell, Cambridge",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Newmarket Road, Bottisham - Solar Array",
   "repd_ref_id": 10485,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2023-12-21",
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "22/01291/ESF",
   "operator": "Ridge Clean Energy Limited",
   "address": "Six Oaks Renewable Energy Park Newmarket Road Bottisham",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-12-21",
     "years_since_consent": 2.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Reach Road",
   "repd_ref_id": 7906,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2020-07-15",
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "20/00655/SON",
   "operator": "UK Power Networks",
   "address": "Armtrac, 70 Reach Road, Burwell, Cambridge, Cambridgeshire",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 6 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2020-07-15",
     "years_since_consent": 6.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Long Barrow Solar Farm Project",
   "repd_ref_id": 9129,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "25/00770/ESF",
   "operator": "Low Carbon Solar Park 42 Limited",
   "address": "N/O New England Farm, Heath Road, Swaffham Bulbeck, Cambridge",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "East Cambridgeshire Council",
    "evidence": {
     "submitted": "2025-07-16",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Weirs Drove, Burwell - Battery Storage Facility",
   "repd_ref_id": 9292,
   "technology": "Battery",
   "capacity_mw": 30.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "21/00816/FUL",
   "operator": "Fen Power 1 Limited",
   "address": "Land North Of Electricity Sub-Station Weirs Drove Burwell, Cambridge",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.2 years for a planning decision",
    "who": "East Cambridgeshire Council",
    "evidence": {
     "submitted": "2021-05-26",
     "months_waiting": 62
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "North Angle Farm",
   "repd_ref_id": 7482,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 29.4,
   "homes_equivalent": 11000,
   "status": "Under Construction",
   "consented": "2020-11-25",
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "20/00761/CCA",
   "operator": "Cambridgeshire County Council / Bouygues ES",
   "address": "Soham, Cambridge, Cambridgeshire",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Chittering Solar Farm - extension 2",
   "repd_ref_id": 1939,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 9.6,
   "homes_equivalent": 3500,
   "status": "Awaiting Construction",
   "consented": "2015-06-16",
   "refused": null,
   "planning_authority": "South Cambridgeshire",
   "planning_ref": "S/1331/14/FL",
   "operator": "Abbey Renewables (North Fen Solar Energy)",
   "address": "Land east and south of Radical Farm, Chittering Drove, Chittering, Cambridgeshire, CB25 9PH",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 11 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2015-06-16",
     "years_since_consent": 11.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Goose Hall Solar Farm",
   "repd_ref_id": 9528,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 5.0,
   "homes_equivalent": 1800,
   "status": "Awaiting Construction",
   "consented": "2021-03-19",
   "refused": null,
   "planning_authority": "East Cambridgeshire",
   "planning_ref": "20/01654/FUL",
   "operator": "Lightsource BP",
   "address": "Goose Hall Farm Factory Road, Burwell Cambridge",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-03-19",
     "years_since_consent": 5.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001298",
  "E14001481",
  "E14001149",
  "E14001512",
  "E14001390",
  "E14001578",
  "E14001497"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}