 "pcon24cd": "E14001196",
 "name": "Dewsbury and Batley",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 49.9,
  "stuck_mw_int": 50,
  "stuck_sites": 2,
  "homes_equivalent": 18000,
  "homes_vs_seat_households": 0.48,
  "stuck_mw_12m_cut": 49.9,
  "consented_not_built_mw_any_age": 50.3,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.8,
  "rank": 141,
  "tech_mix": {
   "solar": 49.9
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Low Farm, Flockton - Solar Photovoltaic Farm",
    "address": "Low Farm, Wakefield Road, Flockton, Huddersfield",
    "repd_ref_id": 9770,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2022-08-24",
    "months_waiting": 47.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Sainsburys, Railway Street - Solar Panels",
    "address": "Sainsburys, Railway Street",
    "repd_ref_id": 20560,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2026-04-20",
    "months_waiting": 3.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Calder Textiles, Dewsbury Mills - Solar Photovoltaic Equipment",
    "address": "Calder Textiles Limited, Dewsbury Mills, Thornhill Road, Dewsbury",
    "repd_ref_id": 14147,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2023-08-02",
    "months_waiting": 36.0,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 37698,
  "seat_total_gbp": 3500000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": []
 },
 "pipeline_projects": [
  {
   "site_name": "Low Farm, Flockton - Solar Photovoltaic Farm",
   "repd_ref_id": 9770,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2022-08-24",
   "refused": null,
   "planning_authority": "Kirklees",
   "planning_ref": "2021/62/93644/E",
   "operator": "Downing LLP",
   "address": "Low Farm, Wakefield Road, Flockton, Huddersfield",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-08-24",
     "years_since_consent": 3.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001418",
  "E14001297",
  "E14001506",
  "E14001324"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}