 "pcon24cd": "E14001114",
 "name": "Boston and Skegness",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 29.3,
   "sites": 2
  }
 },
 "number2": {
  "stuck_mw": 125.4,
  "stuck_mw_int": 125,
  "stuck_sites": 12,
  "homes_equivalent": 46000,
  "homes_vs_seat_households": 0.9,
  "stuck_mw_12m_cut": 125.4,
  "consented_not_built_mw_any_age": 126.3,
  "operational_mw": 113.0,
  "operational_homes_equivalent": 56000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.8,
  "rank": 45,
  "tech_mix": {
   "solar": 125.4
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 1.1,
  "projects": [
   {
    "site_name": "Low Farm Solar Farm",
    "address": "Low Farm",
    "repd_ref_id": 8053,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2021-03-29",
    "months_waiting": 64.2,
    "status": "Under Construction"
   },
   {
    "site_name": "Vicarage Drove - Solar farm & Battery storage",
    "address": "Land at Vicarage Drove, Bicker, Boston",
    "repd_ref_id": 8517,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2024-01-23",
    "months_waiting": 30.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Mallows Lane - Solar Farm & Battery Storage",
    "address": "W/O Mallows Lane & N/O Pymoor Lane, Sibsey, Boston",
    "repd_ref_id": 11654,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 10.0,
    "homes_equivalent": 3600,
    "consented": "2022-12-19",
    "months_waiting": 43.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Boston Landfill, Wyberton - Solar PV Array",
    "address": "Boston Landfill, Slippery Gowt Lane, Wyberton, Boston",
    "repd_ref_id": 9193,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 9.7,
    "homes_equivalent": 3500,
    "consented": "2022-01-21",
    "months_waiting": 54.4,
    "status": "Under Construction"
   },
   {
    "site_name": "Marsh Farm, Sea Lane - Solar Array",
    "address": "Marsh Farm Sea Lane, Wrangle",
    "repd_ref_id": 13224,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.9,
    "homes_equivalent": 700,
    "consented": "2023-05-10",
    "months_waiting": 38.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Hollies Solar Park - Skegness - extension",
    "address": "The Hollies, High Lane, Croft, Skegness, Lincolnshire",
    "repd_ref_id": 1310,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.4,
    "homes_equivalent": 500,
    "consented": "2013-12-04",
    "months_waiting": 151.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Marsh Lane - Solar PV Panels",
    "address": "Howard Tenens, 1 Tenens Way, Boston",
    "repd_ref_id": 12720,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.9,
    "homes_equivalent": 300,
    "consented": null,
    "months_waiting": null,
    "status": "Under Construction"
   },
   {
    "site_name": "Riverside Industrial Estate - Solar PV Panels",
    "address": "Howard Tenens, Riverside Industrial Estate, Marsh Lane, Boston",
    "repd_ref_id": 11198,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.9,
    "homes_equivalent": 300,
    "consented": "2022-06-14",
    "months_waiting": 49.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Greenyard Frozen, Marsh Lane - Solar Panels",
    "address": "Greenyard Frozen, Marsh Lane",
    "repd_ref_id": 13208,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2023-05-09",
    "months_waiting": 38.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Southview Leisure Park, Burgh Road - Solar panels",
    "address": "Southview Leisure Parks Southview Hotel, Southview Main Block & Southview Swimming Pool, Burgh Road, Skegness",
    "repd_ref_id": 16412,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2024-06-26",
    "months_waiting": 25.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "TB Containers Limited, Brenton Villa - Solar Panels",
    "address": "Brenton Villa, Broadgate, Boston",
    "repd_ref_id": 12818,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2023-01-18",
    "months_waiting": 42.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Station Road, Swineshead - Solar PV System",
    "address": "Reflex Labels, North End Business Park, Station Road, Swineshead, Boston",
    "repd_ref_id": 9781,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2021-12-22",
    "months_waiting": 55.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "E & M Hames, Hawthorn Road - Solar Panels",
    "address": "E And M Hames, Hawthorn Road",
    "repd_ref_id": 15363,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-01-18",
    "months_waiting": 30.5,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 50378,
  "seat_total_gbp": 4600000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 536.0,
  "approved_24m_mw": 35.8,
  "refused_mw": 0.0,
  "submitted_mw": 0.2,
  "sites": [
   {
    "site_name": "Bicker Fen Bess, Vicarage Drove - Battery Storage",
    "capacity_mw": 400.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 1402000
   },
   {
    "site_name": "Bicker Drove - Battery Energy Storage System",
    "capacity_mw": 100.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 350000
   },
   {
    "site_name": "Vicarage Drove - Solar farm & Battery storage",
    "capacity_mw": 20.5,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 72000
   },
   {
    "site_name": "Manor Farm Energy Storage",
    "capacity_mw": 10.0,
    "status": "approved",
    "year": 2017,
    "homes_while_discharging": 35000
   },
   {
    "site_name": "Mallows Lane - Solar Farm & Battery Storage",
    "capacity_mw": 5.3,
    "status": "approved",
    "year": 2022,
    "homes_while_discharging": 19000
   },
   {
    "site_name": "Ingoldmells Road, Burgh Le Marsh - Battery Storage",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Boston West Business Park - Micro Energy Storage",
    "capacity_mw": 0.2,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 700
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Bicker Fen Bess, Vicarage Drove - Battery Storage",
   "repd_ref_id": 16628,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-02-05",
   "refused": null,
   "planning_authority": "Boston",
   "planning_ref": "B/24/0415",
   "operator": "FRV TH Powertek Limited",
   "address": "Bicker Fen BESS, Land off Vicarage Drove, Bicker Fen",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-05",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Boston Alternative Energy Facility (BAEF)",
   "repd_ref_id": 6641,
   "technology": "EfW Incineration",
   "capacity_mw": 102.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-07-05",
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010095",
   "operator": "Alternative Use Boston Projects",
   "address": "Riverside Industrial Estate, Boston",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-07-05",
     "years_since_consent": 3.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Bicker Drove - Battery Energy Storage System",
   "repd_ref_id": 17344,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-02-05",
   "refused": null,
   "planning_authority": "Boston",
   "planning_ref": "B/24/0374",
   "operator": "Net Zero Twenty Two Limited",
   "address": "N/O Bicker Drove, Boston",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-05",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Low Farm Solar Farm",
   "repd_ref_id": 8053,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Under Construction",
   "consented": "2021-03-29",
   "refused": null,
   "planning_authority": "East Lindsey",
   "planning_ref": "S/195/02340/20",
   "operator": "Gresham House / Anesco Limited",
   "address": "Low Farm",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Vicarage Drove - Solar farm & Battery storage",
   "repd_ref_id": 8517,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2024-01-23",
   "refused": null,
   "planning_authority": "Boston",
   "planning_ref": "B/21/0443",
   "operator": "Renewable Connections Developments Limited",
   "address": "Land at Vicarage Drove, Bicker, Boston",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-01-23",
     "years_since_consent": 2.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Vicarage Drove - Solar farm & Battery storage",
   "repd_ref_id": 8518,
   "technology": "Battery",
   "capacity_mw": 20.5,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-01-23",
   "refused": null,
   "planning_authority": "Boston",
   "planning_ref": "B/21/0443",
   "operator": "Renewable Connections Developments Limited",
   "address": "Land at Vicarage Drove, Bicker, Boston",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-01-23",
     "years_since_consent": 2.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Mallows Lane - Solar Farm & Battery Storage",
   "repd_ref_id": 11654,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 10.0,
   "homes_equivalent": 3600,
   "status": "Awaiting Construction",
   "consented": "2022-12-19",
   "refused": null,
   "planning_authority": "East Lindsey",
   "planning_ref": "S/152/01297/22",
   "operator": "Pathfinder Clean Energy UK Dev Limited",
   "address": "W/O Mallows Lane & N/O Pymoor Lane, Sibsey, Boston",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-12-19",
     "years_since_consent": 3.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Manor Farm Energy Storage",
   "repd_ref_id": 6948,
   "technology": "Battery",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2017-11-30",
   "refused": null,
   "planning_authority": "East Lindsey",
   "planning_ref": "S/051/00772/17",
   "operator": "Innova Renewables Limited",
   "address": "Manor Farm, Wainfleet Road, Irby-in-the-Marsh, Skegness",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 9 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2017-11-30",
     "years_since_consent": 8.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Boston Landfill, Wyberton - Solar PV Array",
   "repd_ref_id": 9193,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 9.7,
   "homes_equivalent": 3500,
   "status": "Under Construction",
   "consented": "2022-01-21",
   "refused": null,
   "planning_authority": "Boston",
   "planning_ref": "PL/0079/21",
   "operator": "Infinis Solar Developments Limited",
   "address": "Boston Landfill, Slippery Gowt Lane, Wyberton, Boston",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Mallows Lane - Solar Farm & Battery Storage",
   "repd_ref_id": 11655,
   "technology": "Battery",
   "capacity_mw": 5.3,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-12-19",
   "refused": null,
   "planning_authority": "East Lindsey",
   "planning_ref": "S/152/01297/22",
   "operator": "Pathfinder Clean Energy UK Dev Limited",
   "address": "W/O Mallows Lane & N/O Pymoor Lane, Sibsey, Boston",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-12-19",
     "years_since_consent": 3.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Marsh Farm, Sea Lane - Solar Array",
   "repd_ref_id": 13224,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.9,
   "homes_equivalent": 700,
   "status": "Awaiting Construction",
   "consented": "2023-05-10",
   "refused": null,
   "planning_authority": "Boston",
   "planning_ref": "B/23/0034",
   "operator": "Staples Brothers Limited",
   "address": "Marsh Farm Sea Lane, Wrangle",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-05-10",
     "years_since_consent": 3.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "The Hollies Solar Park - Skegness - extension",
   "repd_ref_id": 1310,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.4,
   "homes_equivalent": 500,
   "status": "Awaiting Construction",
   "consented": "2013-12-04",
   "refused": null,
   "planning_authority": "East Lindsey",
   "planning_ref": "S/039/01716/13",
   "operator": "Spencer Farm Produce (Juwi Renewable Energies)",
   "address": "The Hollies, High Lane, Croft, Skegness, Lincolnshire",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 13 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2013-12-04",
     "years_since_consent": 12.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001487",
  "E14001253",
  "E14001476",
  "E14001343"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}